Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 604
Message text: No activity quantities determined for plan/SOP order &.
Scheduling plan or SOP order &v1& results in no activity quantities
found.
Check whether the missing quantities are correct, or whether an error
occurred in the master data or in Customizing. Possible error sources
include:
No appropriate routing found
The work place holds incomplete or faulty activity assignments to cost
centers, resulting in incorrect assignment of cost centers and activity
types
Link between cost center and work place is invalid
Error message extract from SAP system. Copyright SAP SE.
KP604
- No activity quantities determined for plan/SOP order &. ?The SAP error message KP604 ("No activity quantities determined for plan/SOP order") typically occurs in the context of production planning and controlling when the system is unable to determine activity quantities for a planned order or Sales and Operations Planning (SOP) order. This can happen for several reasons, and understanding the cause is essential for finding a solution.
Causes of KP604 Error
Missing Master Data: The required master data (like routing, work center, or production version) may not be properly maintained or may be missing.
Incorrect Planning Parameters: The planning parameters for the order may not be set correctly, leading to the inability to calculate activity quantities.
Order Type Issues: The order type may not be configured correctly in the system, which can prevent the determination of activity quantities.
Capacity Planning Settings: If capacity planning is not set up correctly, the system may not be able to determine the necessary activity quantities.
No Valid Production Version: If there is no valid production version for the material in question, the system cannot determine the necessary activities.
Date Issues: The dates associated with the order may be outside the planning horizon or may not align with the available capacity.
Solutions to KP604 Error
Check Master Data:
- Ensure that all relevant master data (material master, routing, work center) is correctly maintained.
- Verify that the routing is assigned to the material and that it is valid for the planned order.
Review Planning Parameters:
- Check the planning parameters in the order and ensure they are set correctly.
- Make sure that the order type is configured to allow for activity quantity determination.
Validate Production Version:
- Ensure that a valid production version exists for the material and that it is active.
- Check if the production version is assigned to the correct plant.
Adjust Capacity Planning Settings:
- Review the capacity planning settings in the system to ensure they are correctly configured.
- Check if there are any capacity constraints that might be affecting the order.
Examine Dates:
- Verify that the dates on the order are within the planning horizon and that they align with available capacity.
Run Planning Functions:
- If applicable, run the planning functions (like MRP) to see if this resolves the issue.
Related Information
MD04
(Stock/Requirements List), CO01
(Create Production Order), or C223
(Maintain Production Versions) to check the relevant data.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and controlling.
Get instant SAP help. Start your 7-day free trial now.
KP603
Plan/SOP order &: Reference to cost center/activity type is missing.
What causes this issue? During processing of simulated plan or SOP order &v1& for material &v2& in plant &v3&, no cost center...
KP602
Partial transfer only of activity quantities to plan/SOP order &.
What causes this issue? During termination of the plan or SOP order &v1&, start date &v2& and end date &v3& were found. This ...
KP605
Enter a planning scenario.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KP606
Enter a rough planning version.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.