Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 277
Message text: &: Activity relationship with zero activity.
The activity price for this activity type cannot be calculated as it
would involve division by zero. The activity input can therefore not be
included in activity price calculation.
For plan activity price calculation, check planning of &V1& and its
cost planning.
Error message extract from SAP system. Copyright SAP SE.
KP277
- &: Activity relationship with zero activity. ?The SAP error message KP277: "Activity relationship with zero activity" typically occurs in the context of controlling (CO) when dealing with activity types and cost centers in SAP. This error indicates that there is an attempt to assign an activity relationship that does not have any associated activity, which is not valid in the system.
Cause:
- Missing Activity Assignment: The activity type you are trying to use in the activity relationship does not have any activities assigned to it.
- Incorrect Configuration: The configuration for the activity type or the cost center may not be set up correctly, leading to a situation where the system cannot find any valid activities.
- Data Entry Error: There may be a mistake in the data entry, such as selecting the wrong activity type or cost center.
Solution:
Check Activity Type Configuration:
- Go to the configuration settings for the activity type in SAP.
- Ensure that the activity type has been properly defined and that it has valid activities assigned to it.
Review Cost Center Settings:
- Check the cost center to which the activity type is assigned.
- Ensure that the cost center is active and that it has the necessary settings to allow for activity assignments.
Assign Activities:
- If the activity type is missing activities, you will need to assign the appropriate activities to it.
- This can typically be done in the configuration settings for the activity type.
Validate Data Entry:
- Double-check the data you are entering when creating or modifying the activity relationship.
- Ensure that you are selecting the correct activity type and that it is associated with the correct cost center.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring activity types and cost centers.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
KP26
(Activity Type Planning) or KP27
(Change Activity Type Planning) to manage activity types and their assignments.By following these steps, you should be able to resolve the KP277 error and ensure that your activity relationships are correctly configured in SAP.
Get instant SAP help. Start your 7-day free trial now.
KP276
&: Costs planned or posted despite zero activity
What causes this issue? Plan activity and posted activity for &V1& are both 0. Nevertheless, costs were planned or posted.System Response Th...
KP275
&: Manually-set activity price varies.
What causes this issue? You set a manual activity price in &V1&. Simultaneously, an annual price is calculated for version &V3&, mean...
KP278
Ingoing activity relationship in partial iteration.
What causes this issue? In the iterative price calculation framework, the system detected an assignment between &V1& and &V2&. Howeve...
KP279
&: Activity relationship with zero activity.
What causes this issue? For &V1&, plan activity is 0. Nevertheless, activity input was planned for period(s) &V3&.System Response Th...