Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 271
Message text: Receiver in a plan activity allocation was not found.
In the iterative activity price calculation framework, a relationship
between &V1& and &V2& was determined due to planning of an activity
reference. However, the receiver does not exist.
The activity relationship is rejected.
Inform your system administrator. There are faulty data records in the
transaction data files.
Error message extract from SAP system. Copyright SAP SE.
KP271
- Receiver in a plan activity allocation was not found. ?The SAP error message KP271, "Receiver in a plan activity allocation was not found," typically occurs in the context of cost planning and activity allocation in SAP Controlling (CO). This error indicates that the system is unable to find a valid receiver for the planned activity allocation, which can happen for several reasons. Causes: Missing Master Data: The receiver (cost center, internal order, etc.) may not be defined or may be inactive in the system. Incorrect Planning Version: The planning version being used may not be set up correctly or may not include the necessary data. Incorrect Activity Type Assignment: The activity type may not be correctly assigned to the receiver or may not exist in the master data. Invalid Cost Element: The cost element used in the planning may not be valid or may not be assigned to the receiver. Data Consistency Issues: There may be inconsistencies in the planning data or configuration settings. Solutions: Check Master
Get instant SAP help. Sign up for our Free Essentials Plan.
KP270
Activity price calculation without activity not possible.
What causes this issue? A program error occurred during activity price calculation. The activity price for &V1& could not be determined becau...
KP269
Object & not available, but has activity records.
What causes this issue? In activity price calculation, activity quantities were read in for object &V1&. However, the object is not available...
KP272
Sender in an activity relationship has no activity.
What causes this issue? In the iterative activity price calculation framework, a relationship between &V1& and &V2& was determined du...
KP273
&: Activity is less than scheduled.
What causes this issue? Planning of activity quantities for &V1& in period(s) &V3& is not reconciled. Plan activity is smaller than t...
Click on this link to search all SAP messages.