Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 662
Message text: Enter the plan version for the plan element
You have selected the plan/actual indicator "Plan" for an element of
the layout.
You therefore also need to select the characteristic "Version" for that
element.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Specify a version for the relevant element.
If you have already selected the characteristic "Version" somewhere
else in the layout, you need to remove it there first.
Error message extract from SAP system. Copyright SAP SE.
KM662
- Enter the plan version for the plan element ?The SAP error message KM662 ("Enter the plan version for the plan element") typically occurs in the context of SAP Controlling (CO) when working with planning functions, particularly in the area of cost planning or profitability analysis. This error indicates that the system requires a plan version to be specified for the plan element you are trying to work with.
Cause:
- Missing Plan Version: The most common cause of this error is that the user has not specified a plan version when trying to execute a planning transaction or report.
- Configuration Issues: There may be configuration issues in the planning settings that do not allow the system to recognize the plan version.
- User Input Error: The user may have overlooked entering the plan version in the relevant field.
Solution:
- Enter Plan Version: Ensure that you enter a valid plan version in the relevant field. The plan version is typically a key that identifies a specific version of the planning data.
- Check Configuration: If you are responsible for system configuration, check the settings in the planning area to ensure that the plan versions are correctly defined and activated.
- Review User Input: Double-check the input fields to ensure that all required information, including the plan version, is filled out correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning transaction you are using, as different transactions may have different requirements for plan versions.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Controlling.
Get instant SAP help. Start your 7-day free trial now.
KM661
All selected plan versions are locked
What causes this issue? You have only selected locked plan versions. Consequently, the system does not allow any manual entries.System Response Proc...
KM660
No number range can be maintained for Rollup document type &1
What causes this issue? No number range is defined for chosen Rollup document type &V1&.System Response The system issues an error message a...
KM663
No valid master data for &1
What causes this issue? No valid master data exists for characteristic &V1& in the period being planned.How to fix this error? Create valid ...
KM664
You have only selected profit and loss accounts which cannot be entered
What causes this issue? For the characteristic "Account" you have only selected profit and loss accounts or revenue/cost elements. Conseque...
Click on this link to search all SAP messages.