Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 160
Message text: Standard hierarchy & for COAr & already contains profit center(s)
You wish to change the standard hierarchy of a controlling area,
however, profit centers have already been assigned to the hierarchy.
For this reason, you may not change the standard hierarchy for this
controlling area.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message KM160 typically occurs in the context of controlling (CO) when you are trying to assign a profit center to a standard hierarchy that already contains profit centers. This error indicates that the standard hierarchy you are trying to modify or use is not compatible with the current configuration because it already has existing profit centers.
Cause:
- Existing Profit Centers: The standard hierarchy you are trying to work with already contains one or more profit centers. SAP does not allow the addition of new profit centers to a hierarchy that already has existing entries.
- Hierarchy Structure: The structure of the standard hierarchy may not allow for the addition of new profit centers due to its configuration.
- Data Integrity: SAP enforces data integrity rules to ensure that the hierarchy remains consistent and valid.
Solution:
- Review the Standard Hierarchy: Check the existing profit centers in the standard hierarchy. You can do this by navigating to the relevant transaction (e.g., KSH1 for creating a standard hierarchy or KSH2 for changing it) and reviewing the current structure.
- Create a New Hierarchy: If you need to add new profit centers, consider creating a new standard hierarchy that does not have any existing profit centers. This can be done using the transaction KSH1.
- Remove Existing Profit Centers: If it is appropriate for your business process, you may consider removing existing profit centers from the hierarchy. However, this should be done with caution, as it may affect reporting and other processes.
- Consult Documentation: Refer to SAP documentation or help files for more detailed instructions on managing standard hierarchies and profit centers.
- Check Authorizations: Ensure that you have the necessary authorizations to make changes to the standard hierarchy.
Related Information:
By following these steps, you should be able to resolve the KM160 error and manage your standard hierarchy and profit centers effectively.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
KM159 Profit center group & exists in controlling area &
What causes this issue? Profit center group &V1& was created in control...
KM158 Balance sheet/profit + loss structure & does not exist
What causes this issue? The balance sheet/profit and loss structure &V1&...
KM161 Error reading the material master &1 in plant &2
What causes this issue? An error occurred when the system tried to read the mat...
KM162 Distribution scenario "02" is not allowed
What causes this issue? To activate the distribution scenario "02" (d...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.