Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 017
Message text: Analysis period was not changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KM017
- Analysis period was not changed ?The SAP error message KM017, which states "Analysis period was not changed," typically occurs in the context of SAP Controlling (CO) when working with the Profitability Analysis (CO-PA) module or other related areas where analysis periods are defined.
Cause:
The error message KM017 usually indicates that the system is trying to perform an operation that requires a change in the analysis period, but the analysis period has not been modified as expected. This can happen due to several reasons, including:
- Incorrect Configuration: The analysis period may not be set up correctly in the system configuration.
- Data Locking: The data for the specified period may be locked, preventing changes.
- User Authorization: The user may not have the necessary authorizations to change the analysis period.
- System Settings: The system settings may restrict changes to the analysis period based on certain criteria.
Solution:
To resolve the KM017 error, you can take the following steps:
Check Configuration:
- Verify the configuration settings for the analysis period in the relevant controlling area. Ensure that the periods are defined correctly and that the system is set up to allow changes.
Unlock Data:
- If the data for the analysis period is locked, you may need to unlock it. This can typically be done by a user with the appropriate authorizations.
Review Authorizations:
- Ensure that the user attempting to change the analysis period has the necessary authorizations. You may need to consult with your SAP security team to verify and adjust user roles if needed.
Change Analysis Period:
- If you are trying to change the analysis period in a report or transaction, ensure that you are following the correct procedure to do so. Sometimes, the analysis period can be changed in the selection screen or settings of the report.
Consult Documentation:
- Review SAP documentation or notes related to the specific transaction or report you are using. There may be specific instructions or known issues that can provide additional guidance.
Contact SAP Support:
- If the issue persists after trying the above steps, consider reaching out to SAP support for further assistance. They may have additional insights or patches that can resolve the issue.
Related Information:
By following these steps, you should be able to identify the cause of the KM017 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KM016
Select the line(s) to be copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KM015
Select required field(s)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KM018
New analysis period may not overlap with original
What causes this issue? The time period you have selected exceeds the valid time period of the profit center.System Response The system issues an er...
KM019
Profit center group & cannot be used here
What causes this issue? The profit center group <(>&<)> is not assigned to the standard hierarchy.System Response The system issues ...
Click on this link to search all SAP messages.