Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 576
Message text: You have no authorization to change planning of cost element & &
You do not have authorization to create or change planning for cost
element &V2& in controlling area &V1&.
INCLUDE NA_AUTH_K_CSKB_PLA OBJECT DOKU ID TX LANGUAGE E
Error message extract from SAP system. Copyright SAP SE.
KI576
- You have no authorization to change planning of cost element & & ?The SAP error message KI576 indicates that a user does not have the necessary authorization to change the planning for a specific cost element. This is a common issue in SAP systems, particularly in the context of controlling (CO) modules where cost planning is involved.
Cause:
The error typically arises due to one or more of the following reasons:
- Authorization Issues: The user lacks the required authorization object to perform planning activities on the specified cost element.
- Cost Element Configuration: The cost element may be configured in such a way that it restricts changes based on certain criteria (e.g., it may be a statistical cost element).
- User Role Assignment: The user’s role may not include the necessary permissions for the specific cost center or cost element in question.
Solution:
To resolve the KI576 error, you can take the following steps:
Check User Authorizations:
- Use transaction code SU53 immediately after encountering the error to see which authorization check failed. This will provide insight into what specific authorization is missing.
- Review the user’s roles and authorizations in transaction PFCG. Ensure that the user has the necessary authorizations for the relevant cost element and planning activities.
Modify User Roles:
- If the user lacks the necessary authorizations, you may need to modify their roles or create a new role that includes the required authorizations. This may involve adding authorization objects such as:
- K_CCACTVT (Activity)
- K_CCACTVT (Cost Center Activity)
- K_CELEM (Cost Element)
- Ensure that the user has the appropriate activity (e.g., change, display) for the cost element.
Consult with Security Team:
- If you do not have the necessary permissions to change roles or authorizations, consult with your SAP security team or administrator. They can help identify and grant the required authorizations.
Check Cost Element Settings:
- Verify the configuration of the cost element in transaction KA03 (Display Cost Element). Ensure that it is set up correctly for planning and that there are no restrictions preventing changes.
Testing:
- After making the necessary changes, have the user log out and log back in to ensure that the new authorizations take effect. Then, attempt the planning activity again.
Related Information:
By following these steps, you should be able to resolve the KI576 error and enable the user to change the planning for the specified cost element.
Get instant SAP help. Start your 7-day free trial now.
KI575
You are not authorized to display planning in cost center & &
What causes this issue? You do not have authorization to display planning in cost center &V2& in controlling area &V1&. INCLUDE NA_AU...
KI574
You have no authorization to change planning of cost center & &
What causes this issue? You do not have authorization to create or change planning in cost center &V2& in controlling area &V1&. INCL...
KI577
You have no authorization to display planning of cost element & &
What causes this issue? You do not have authorization to display planning for cost element &V2& in controlling area &V1&. INCLUDE NA_...
KI578
You have no authorization for reports on cost center & &, cost element &
What causes this issue? You do not have authorization to display a report for cost center &V2&, cost element &V3& in controlling area...
Click on this link to search all SAP messages.