Message type: E = Error
Message class: KFPR - Transfer Prices for Individual Projects
Message number: 211
Message text: WBS elements &1 and &2 both belong to subproject &3
Transfer price agreements are only possible between different
<GL:subproject>subprojects</>. The WBS element entered, &V1&, (
<GL:delivering_WBS_element>delivering WBS element</>) and WBS element
&V2& (ordering WBS element) hierarchically above it belong to the same
subproject &V3&.
If the message is an error message, processing stops.
Check your input.In the WBS element overview, choose <LS>Goto -> WBS
element overview -> Subprojects</> to view the project split into
subprojects.
You can switch off this error message:
If you do not want to enforce the subproject exchange rule between WBS
elements. You should ALWAYS enforce the exchange if you want to use
budgeting or active availability control for projects.
In the Project System IMG, in the activity
<DS:SIMG.SIMG_OLPR_V_T100C>Change message control</>. Specify work area
KFPR and maintain the entry for message 211. If you do not specify a
user, the entry applies to all users.
Error message extract from SAP system. Copyright SAP SE.
KFPR211
- WBS elements &1 and &2 both belong to subproject &3 ?The SAP error message KFPR211 indicates that there is an issue with the assignment of Work Breakdown Structure (WBS) elements in a project. Specifically, the error states that the two WBS elements mentioned in the message belong to the same subproject, which can lead to conflicts in project planning or budgeting.
Cause: The error typically arises in the following scenarios: Duplicate Assignment: You are trying to assign or link two WBS elements that are part of the same subproject, which is not allowed in SAP. Incorrect Configuration: The project structure may not be set up correctly, leading to conflicts in the hierarchy of WBS elements. Data Entry Error: There may be a mistake in the data entry where the same WBS element is being referenced multiple times incorrectly.
Solution: To resolve the KFPR211 error, you can take the following steps: Check WBS Structure: Review the hierarchy of your WBS elements to ensure that they are correctly structured and
Get instant SAP help. Sign up for our Free Essentials Plan.
KFPR210
WBS element & is the top element in the WBS hierarchy
What causes this issue? WBS element &V1& is the top element in its project hierarchy. This is not allowed in the transfer price agreement bec...
KFPR209
Cost element & is not a revenue element
What causes this issue? You have entered a <GL:cost_element>cost element</> that is not assigned to cost element category 11 (revenues).S...
KFPR212
Activity not allowed for statistical WBS element &
What causes this issue? Transfer prices are not permitted for statistical WBS elements.System Response INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID...
KFPR213
Provider &1 and receiver &2 belong to the same profit center
What causes this issue? Service provider &V1& and receiver &V2& belong to the same profit center, &V3&. You can switch this e...