How To Fix KE_CHACO048 - Enter a valuation date for the planning data


KE_CHACO048 - Overview

  • Message type: E = Error

  • Message class: KE_CHACO - Message class for operating concern merge/split

  • Message number: 048

  • Message text: Enter a valuation date for the planning data

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KE_CHACO048 - Enter a valuation date for the planning data ?
    The SAP error message KE_CHACO048, which states "Enter a valuation date for the planning data," typically occurs in the context of planning and controlling (CO) modules, particularly when dealing with cost planning or profitability analysis.
    
    Cause: This error usually arises when a user attempts to execute a planning transaction without specifying a valuation date. The valuation date is crucial as it determines the time frame for which the planning data is relevant. If the system does not have a valuation date, it cannot process the planning data correctly.
    Solution: To resolve this error, you need to ensure that a valuation date is entered in the relevant planning transaction. Here are the steps you can take: Check the Transaction: Ensure you are in the correct planning transaction where the valuation date is required. Enter Valuation Date: Look for a field labeled "Valuation Date" or similar in the planning screen. Enter a valid date that corresponds to the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant