Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: KE -
Message number: 393
Message text: Weekly planning can only be used with plan data in costing-based CO-PA
The field "Weekly planning" can only be selected when you transfer plan
data to costing-based CO-PA.
When you transfer actual data, the system automatically determines the
correct week, provided that your operating concern stores data in
weeks.
When you transfer plan data to account-based CO-PA, you can only
transfer period values.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KE393
- Weekly planning can only be used with plan data in costing-based CO-PA ?The SAP error message KE393 indicates that the weekly planning functionality in SAP's Controlling (CO) module, specifically in the context of Costing-based Profitability Analysis (CO-PA), cannot be utilized because the planning data is not in the required format. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Data Type Mismatch: The error occurs when you attempt to use weekly planning features with plan data that is not in costing-based CO-PA. This means that the planning data must be structured in a way that is compatible with costing-based CO-PA.
- Planning Configuration: The configuration settings in your SAP system may not be set up to support weekly planning for the type of CO-PA you are using (costing-based vs. account-based).
- Incorrect Planning Version: You may be trying to use a planning version that is not configured for costing-based CO-PA.
Solutions:
- Check Planning Type: Ensure that the planning type you are using is compatible with costing-based CO-PA. You may need to switch to a planning type that supports this functionality.
- Review Configuration: Go to the configuration settings in SAP and verify that the settings for CO-PA and planning are correctly set up to allow for weekly planning. This may involve checking the settings in transaction code SPRO.
- Use Costing-Based CO-PA: If your organization is using account-based CO-PA, consider switching to costing-based CO-PA if it aligns with your business requirements and reporting needs.
- Consult Documentation: Review SAP documentation or help files related to CO-PA planning to ensure that you are following the correct procedures and using the right data formats.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, especially if you suspect a system configuration issue.
Related Information:
By addressing the underlying cause of the error and ensuring that your planning data is correctly configured for costing-based CO-PA, you should be able to resolve the KE393 error and utilize the weekly planning functionality effectively.
Get instant SAP help. Sign up for our Free Essentials Plan.
KE392
Operating concern assignment deleted only
What causes this issue? If you delete a selected line, any operating concern entered will be deleted but not the entire entry.System Response The sy...
KE391
Assign condition type & in CO-PA
What causes this issue? The system tried to transfer billing data to Profitability Analysis. However, an error was found in the assignment of conditi...
KE394
Enter valid plan /actual indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KE395
Assign the controlling area to an operating concern
What causes this issue? No controlling area has been assigned to operating concern &V1&.System Response The system issues an error message a...
Click on this link to search all SAP messages.