How To Fix KE384 - Caution: You are changing the operating concern assignment


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KE -

  • Message number: 384

  • Message text: Caution: You are changing the operating concern assignment

  • Show details Hide details
  • What causes this issue?

    You want to reassign the controlling area from operating concern "&V1&"
    to operating concern "&V2&".
    Making this realignment in the production system requires other
    measures to be taken as well. Consult note 199959 for a detailed
    description of the problems related to such a realignment.

    System Response

    By changing the current assignment, objects that have already been
    assigned to an account are made invalid and can no longer be used. If
    there are no customer programs to ensure that existing account
    assignments (to SD documents, projects, and so forth) are correctly
    handled or deleted, making such realignments causes the program to
    terminate.

    How to fix this error?

    Given the above complications, SAP strongly advises against making
    realignments in the production system. If such realignments are
    essential, then you should only perform them after discussion with SAP
    or your consultant.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KE384 - Caution: You are changing the operating concern assignment ?
    The SAP error message KE384 indicates that you are attempting to change the operating concern assignment in a way that could potentially affect the integrity of the data in the system. This warning is typically encountered in the context of Profitability Analysis (CO-PA) when you are trying to modify the assignment of a controlling area to an operating concern.
    
    Cause: The error message KE384 is triggered when: You are trying to change the operating concern assignment for a controlling area that already has data posted to it. The change could lead to inconsistencies in the profitability analysis data, as the operating concern is a critical component in how data is structured and reported in CO-PA.
    Solution: To resolve this issue, consider the following steps: Review the Change: Before proceeding with the change, ensure that you understand the implications of changing the operating concern assignment. Check if the controlling area has any existing data that could be affected. Data

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant