Do you have any question about this error?
Message type: E = Error
Message class: KCR - Cost Resource (CO Internal Activities in iPPE)
Message number: 008
Message text: No resource assignments found in iPPE
You have tried to determine the iPPE resource to which a cost
center/activity type or a business process is assigned for calculating
costs.
The system could not find any such iPPE resources.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KCR008
- No resource assignments found in iPPE ?The SAP error message KCR008, which states "No resource assignments found in iPPE," typically occurs in the context of Integrated Product and Process Engineering (iPPE) within SAP. This error indicates that the system could not find any resource assignments for the specified object, which can hinder processes such as production planning or scheduling.
Causes:
- Missing Resource Assignments: The most common cause is that the relevant resources (like work centers, machines, or personnel) have not been assigned to the product or process in the iPPE model.
- Incorrect Configuration: There may be an issue with the configuration of the iPPE model, leading to the absence of resource assignments.
- Data Inconsistency: There could be inconsistencies in the data, such as missing or incorrect entries in the master data related to resources or products.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or access the resource assignments.
Solutions:
Check Resource Assignments:
- Navigate to the iPPE model in SAP and verify that the necessary resources are correctly assigned to the relevant product or process.
- Ensure that all required resources are defined and linked properly.
Review Configuration:
- Check the configuration settings in the iPPE model to ensure that they are set up correctly.
- Make sure that the resource types and categories are correctly defined.
Data Validation:
- Perform a data consistency check to identify any missing or incorrect entries in the master data.
- Use transaction codes like
C223
(for changing resource assignments) to review and correct any discrepancies.User Authorizations:
- Ensure that the user has the necessary authorizations to access and modify resource assignments in the iPPE model.
- Consult with your SAP security team if there are any authorization issues.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on iPPE and resource assignments.
- Check for any known issues or patches related to the version of SAP you are using.
Related Information:
C223
(Change Resource Assignment) and C223N
(Create Resource Assignment) for managing resource assignments.By following these steps, you should be able to identify the cause of the KCR008 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KCR007
Controlling areas do not match
What causes this issue? The system requires that the cost center/activity type or business process be assigned to controlling area &v1&, but ...
KCR006
Select the entries you wish to delete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KCRP001
Select column first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KCRP002
Characteristic &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.