Do you have any question about this error?
Message type: E = Error
Message class: KA - CO Overhead Costs: Overhead, Accrual Calculation
Message number: 265
Message text: You can use calculation base & only once
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KA265
- You can use calculation base & only once ?The SAP error message KA265 ("You can use calculation base & only once") typically occurs in the context of cost planning or cost allocation in SAP Controlling (CO) when you are trying to use a calculation base that has already been utilized in a previous calculation or allocation. This error is designed to prevent double counting or incorrect calculations in cost planning.
Cause:
- Duplicate Use of Calculation Base: The calculation base you are trying to use has already been applied in the same planning session or allocation process.
- Incorrect Configuration: There may be a configuration issue in the cost planning settings that allows for the same calculation base to be selected multiple times.
- Data Entry Error: The user may have inadvertently selected the same calculation base multiple times during the planning process.
Solution:
- Review Calculation Bases: Check the calculation bases you have selected in your planning session. Ensure that each calculation base is used only once.
- Adjust Planning Entries: If you find that a calculation base has been selected multiple times, remove the duplicate entry and ensure that each base is unique.
- Configuration Check: If this error persists, review the configuration settings in the SAP system related to cost planning and allocation. Ensure that the settings align with your business processes and do not allow for duplicate entries.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the calculation bases and their intended use.
- Seek Help from SAP Support: If you are unable to resolve the issue, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KA264
You cannot enter a credit for a calculation base
What causes this issue? You entered a credit for a calculation base. You can only do this for an overhead.System Response The system issues an erro...
KA263
Enter either a calculation base or an overhead rate
What causes this issue? You entered both a calculation base and an overhead in one line. This is not permitted.System Response The system issues an ...
KA266
Calculation base & does not exist
What causes this issue? Calculation base &V1& does not exist.System Response The system issues an error message and will not allow you to co...
KA267
Specify a credit
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.