How To Fix K8063 - Sender cost center intitial value cannot be used in activity inputs.


K8063 - Overview

  • Message type: E = Error

  • Message class: K8 - CO Planning: Messages for Function Group KAPP

  • Message number: 063

  • Message text: Sender cost center intitial value cannot be used in activity inputs.

  • Show details Hide details
  • What causes this issue?

    You included the initial selection criteria value for the
    characteristic "Sender cost center" or "Sender activity type" (for
    instance, within the sender cost center group).
    However, the initial value is useful only for a plan record that is not
    an activity input.
    In your entry screen, though, the characteristic "Cost element" is not
    included or was not filled in the initial screen. This means that only
    plan records for activity input can be processed during this planning
    session.
    Therefore, the initial value cannot be used here..

    System Response

    The initial value for the characteristic "Sender cost center" or
    "Sender activity type" is rejected.

    How to fix this error?

    Use an entry screen intended for other plan records and not just for
    activity input planning.
    Fill the cost element characteristic in the initial screen.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message K8063 - Sender cost center intitial value cannot be used in activity inputs. ?
    The SAP error message K8063 ("Sender cost center initial value cannot be used in activity inputs") typically occurs in the context of controlling (CO) when you are trying to allocate costs or perform activity allocations using a cost center that has not been properly initialized or is not valid for the operation you are attempting.
    
    Cause: Uninitialized Cost Center: The sender cost center may not have been initialized correctly in the system. This can happen if the cost center is new and has not been set up with the necessary parameters. Incorrect Configuration: The cost center may not be configured to allow activity inputs. This could be due to missing settings in the controlling area or the cost center master data. Invalid Cost Center: The cost center may not be valid for the period in which you are trying to perform the activity allocation. For example, it may be closed or inactive. Missing Activity Types:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker