How To Fix JITOUT519 - Tolerance period breached for JIT call &1; JIT date &2, JIT time &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: JITOUT - Messages for JIT Outbound

  • Message number: 519

  • Message text: Tolerance period breached for JIT call &1; JIT date &2, JIT time &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JITOUT519 - Tolerance period breached for JIT call &1; JIT date &2, JIT time &3 ?

    The SAP error message JITOUT519 indicates that the tolerance period for a Just-In-Time (JIT) call has been breached. This typically occurs in the context of JIT delivery processes, where materials are delivered to production lines just in time for their use. The error message provides specific details about the JIT call, including the call number, date, and time.

    Cause:

    The error is triggered when the actual delivery of materials does not occur within the predefined tolerance period set for the JIT call. This can happen due to various reasons, such as:

    • Delays in transportation or logistics.
    • Production scheduling issues.
    • Incorrect configuration of the JIT call parameters.
    • Changes in demand that were not communicated in time.
    • Supplier issues or delays in material readiness.

    Solution:

    To resolve the JITOUT519 error, consider the following steps:

    1. Check JIT Call Parameters: Review the configuration of the JIT call to ensure that the tolerance periods are set correctly. This includes checking the lead times and any specific settings related to the JIT process.

    2. Analyze Delivery Status: Investigate the status of the delivery associated with the JIT call. Check if the materials were dispatched on time and if there were any delays in the supply chain.

    3. Communicate with Suppliers: If the issue is related to supplier delays, communicate with them to understand the reasons for the delay and to find a solution.

    4. Adjust Tolerance Periods: If the current tolerance periods are too strict for your operational needs, consider adjusting them in the system settings to allow for more flexibility.

    5. Monitor Production Schedule: Ensure that the production schedule aligns with the JIT delivery schedule. Any changes in production should be communicated to the logistics team promptly.

    6. Review System Logs: Check the system logs for any additional error messages or warnings that may provide more context about the issue.

    7. Consult Documentation: Refer to SAP documentation or support resources for specific guidance on handling JIT-related errors.

    Related Information:

    • JIT (Just-In-Time) Delivery: A strategy that aligns raw-material orders from suppliers directly with production schedules.
    • Tolerance Period: The time frame within which deliveries are expected to occur to meet production needs without causing delays.
    • SAP Modules: This error is typically related to modules such as SAP MM (Materials Management) and SAP PP (Production Planning).

    If the issue persists after following these steps, it may be beneficial to engage with SAP support or consult with a technical expert familiar with your specific SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant