How To Fix JITOUT149 - ***************** DPP-RELATED MESSAGES ********************************


JITOUT149 - Overview

  • Message type: E = Error

  • Message class: JITOUT - Messages for JIT Outbound

  • Message number: 149

  • Message text: ***************** DPP-RELATED MESSAGES ********************************

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JITOUT149 - ***************** DPP-RELATED MESSAGES ******************************** ?
    The SAP error message JITOUT149 is related to the Just-In-Time (JIT) production process, specifically within the context of Demand Planning and Production Planning. This error typically indicates that there is an issue with the JIT delivery process, which can be caused by various factors.
    
    Cause: Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, production versions, or BOMs (Bill of Materials). Planning Parameters: Incorrect planning parameters or settings in the JIT configuration can lead to this error. Delivery Schedules: Issues with delivery schedules or the lack of a valid delivery schedule for the JIT process can trigger this error. Stock Availability: Insufficient stock or incorrect stock levels can also cause this error, as JIT relies on precise inventory levels. Integration Issues: Problems with integration between different modules (like PP, MM, and SD) can lead to this error.
    Solution: Check Master Data: Verify the material master data, production versions, and BOMs for accuracy

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker