How To Fix JIT00040 - A new scheduling agreement was not created for the JIT material


JIT00040 - Overview

  • Message type: E = Error

  • Message class: JIT00 - JIT: Messages for JIT Process

  • Message number: 040

  • Message text: A new scheduling agreement was not created for the JIT material

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JIT00040 - A new scheduling agreement was not created for the JIT material ?
    The SAP error message JIT00040 indicates that a new scheduling agreement was not created for a Just-In-Time (JIT) material. This error typically arises in the context of JIT delivery processes, where materials are delivered just in time for production, and scheduling agreements are used to manage these deliveries.
    
    Cause: Missing Configuration: The JIT process may not be properly configured in the system. This includes settings related to scheduling agreements, JIT materials, and the relevant plant or vendor settings. Material Master Data Issues: The material in question may not be set up correctly in the material master. This includes missing JIT-specific data or incorrect settings. Vendor Issues: The vendor associated with the JIT material may not be set up correctly or may not have the necessary agreements in place. Scheduling Agreement Not Defined: There may not be an existing scheduling agreement for the material, or the existing agreement may not meet the requirements for the JIT

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author