Do you have any question about this error?
Message type: E = Error
Message class: J6 - IS-B: Yield curves
Message number: 078
Message text: Maintain the calendar
If you use the interest calculation method actW/252, you must specify a
calendar.
Unable to save the yield curve type.
Enter the calendar.
Error message extract from SAP system. Copyright SAP SE.
J6078
- Maintain the calendar ?The SAP error message J6078, "Maintain the calendar," typically occurs in the context of SAP's Project System (PS) or other modules that rely on calendar settings for scheduling and planning. This error indicates that the system requires a calendar to be defined for a specific project, task, or resource, and it has not been set up correctly.
Cause:
- Missing Calendar Definition: The most common cause is that the calendar for the project or resource has not been defined or is incomplete.
- Incorrect Configuration: The calendar may be incorrectly configured, leading to inconsistencies in scheduling.
- Project Settings: The project or task may not have the necessary settings to reference a calendar.
- Resource Assignment: If a resource is assigned to a project without a defined calendar, this error may occur.
Solution:
To resolve the J6078 error, follow these steps:
Maintain Project Calendar:
- Go to the transaction code CJ20N (Project Builder) or CJ02 (Change Project).
- Select the project that is causing the error.
- Navigate to the "Basic Data" tab and check the "Project Calendar" field.
- If it is empty or incorrect, assign the appropriate calendar.
Maintain Resource Calendar:
- If the error is related to a resource, go to the transaction code CR02 (Change Work Center) or PP01 (Change HR Master Data).
- Check the calendar settings for the work center or resource and ensure that a valid calendar is assigned.
Check Task Calendar:
- If the error is related to a specific task, ensure that the task has a calendar assigned in the task settings.
Review Configuration:
- If you have access to configuration settings, check the settings for the project system and ensure that the calendar settings are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help files for more detailed instructions on maintaining calendars in your specific version of SAP.
Related Information:
By following these steps, you should be able to resolve the J6078 error and maintain the necessary calendar settings in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
J6077
Yield curve values missing: function not possible
What causes this issue? No yield curve values available.System Response Unable to execute the function.How to fix this error? Choose a different fu...
J6076
Curr. redemption for yld cve type & contains currencies to be deleted
What causes this issue? Currency replacement for this yield curve type contains at least on of the selected currencies.System Response Currencies ca...
J6079
Maintain the calendar for the reference interest rate '&'
What causes this issue? No calendar is assigned to the reference interest rate. Since the interest calculation method actW/252 is being used for this...
J6080
Yield cat. zero bond yield and interpolation basis par rate not supported
What causes this issue? You have selected the yield category "zero bond yield" and the interpolation basis "par rate". This combi...
Click on this link to search all SAP messages.