How To Fix J2114 - &4: Wrong key for moving planning date to working day


SAP Error Message - Details

  • Message type: E = Error

  • Message class: J2 - Message Class for Development Class JBT

  • Message number: 114

  • Message text: &4: Wrong key for moving planning date to working day

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message J2114 - &4: Wrong key for moving planning date to working day ?

    The SAP error message J2114 &4: "Wrong key for moving planning date to working day" typically occurs in the context of production planning or scheduling within SAP. This error indicates that there is an issue with the date being used for planning, specifically that the system is unable to convert a planned date into a valid working day.

    Causes:

    1. Invalid Date Configuration: The date being used may not correspond to a valid working day in the calendar settings of the system.
    2. Calendar Settings: The factory calendar or holiday calendar may not be set up correctly, leading to the system not recognizing the date as a working day.
    3. Date Format Issues: There may be issues with the format of the date being inputted, causing the system to misinterpret it.
    4. Master Data Issues: The master data for the materials or resources involved may not be correctly configured, leading to scheduling conflicts.

    Solutions:

    1. Check Calendar Settings:

      • Go to the transaction code SCAL to check the factory calendar and ensure that the working days are correctly defined.
      • Verify that the holiday calendar is correctly set up and that the date in question is not a holiday.
    2. Review the Date Input:

      • Ensure that the date being used is in the correct format and corresponds to a valid working day.
      • If the date is being generated programmatically, check the logic to ensure it is producing valid dates.
    3. Validate Master Data:

      • Check the master data for the materials and resources involved in the planning process. Ensure that all relevant data is correctly maintained.
      • Look for any discrepancies in the planning parameters that might affect scheduling.
    4. Use Transaction Codes for Troubleshooting:

      • Use transaction codes like MD04 (Stock/Requirements List) or MD01 (MRP Run) to analyze the planning situation and identify any issues with the dates being used.
    5. Consult SAP Notes:

      • Check the SAP Support Portal for any relevant SAP Notes that might address this specific error message. There may be patches or updates that resolve known issues.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. Provide them with detailed information about the error and the context in which it occurs.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as SCAL, MD04, MD01, and others related to production planning and scheduling.
    • Documentation: Review SAP documentation related to production planning and scheduling for best practices and configuration guidelines.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify and resolve the cause of the J2114 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant