Do you have any question about this error?
Message type: E = Error
Message class: IW - Order Processing
Message number: 846
Message text: Duration for activity & is too large - check
When multiplied by the total quantity, the duration in the operation
&V1& produces a value which is too large.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Maintain a smaller value for the total quantity.
Error message extract from SAP system. Copyright SAP SE.
IW846
- Duration for activity & is too large - check ?The SAP error message IW846, which states "Duration for activity & is too large - check," typically occurs in the context of project management or maintenance planning within SAP. This error indicates that the duration specified for a particular activity exceeds the allowable limits set in the system.
Cause:
- Excessive Duration: The most common cause is that the duration entered for an activity is greater than what the system allows. This could be due to a data entry error or an unrealistic estimation of the time required for the task.
- Configuration Settings: The system may have configuration settings that limit the maximum duration for activities. This can be set in the project management or maintenance planning modules.
- Calendar Settings: If the activity duration is calculated based on working days or hours, the calendar settings (like holidays or non-working days) may affect the total duration.
- Dependencies and Constraints: If there are dependencies or constraints that affect the scheduling of the activity, it may lead to an unrealistic duration being calculated.
Solution:
- Check Activity Duration: Review the duration entered for the activity. Ensure that it is realistic and within acceptable limits.
- Adjust Configuration Settings: If necessary, consult with your SAP administrator to review and adjust the configuration settings that govern maximum activity durations.
- Review Calendar Settings: Check the calendar settings to ensure that they are correctly configured and that they reflect the actual working days and hours.
- Reassess Dependencies: Look at any dependencies or constraints that may be affecting the scheduling of the activity. Adjust them if necessary to allow for a more realistic duration.
- Use Alternative Scheduling: If the activity genuinely requires a longer duration, consider breaking it down into smaller tasks or activities that can be scheduled separately.
Related Information:
If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project management or maintenance planning within SAP.
Get instant SAP help. Start your 7-day free trial now.
IW845
Work for activity & is too large - check
What causes this issue? When multiplied by the total quantity, the work in the operation &V1& produces a value which is too large.System Resp...
IW843
Storage location &1 is HU administered.
What causes this issue? Handling Unit Management is active for the plant that you entered.System Response INCLUDE 'NO PROCESSING' OBJECT D...
IW847
Quantity of component & is too large - check
What causes this issue? When multiplied by the total quantity, the quantity of material component &V1& produces a value which is too large.Sy...
IW848
Operation quantity for operation & is too large - check
What causes this issue? WHen multiplied by the total quantity, the operation quantity in the operation &V1& produces a value which is too lar...
Click on this link to search all SAP messages.