Message type: E = Error
Message class: IVE_E_INVOICE - Message class for IVE_E invoice services
Message number: 012
Message text: For ProjectElement-TypeCode 8 length of ProjectElementID should be 16
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message IVE_E_INVOICE012 indicates that there is an issue with the length of the ProjectElementID for a specific ProjectElement-TypeCode. In this case, the error specifies that for ProjectElement-TypeCode 8, the length of ProjectElementID should be exactly 16 characters.
Cause: The error typically arises when the ProjectElementID provided in the invoice or transaction does not meet the required length of 16 characters. This can happen due to: Incorrect Data Entry: The ID may have been entered incorrectly, either being too short or too long. Data Migration Issues: If data was migrated from another system, the IDs may not conform to the expected format.
Configuration Issues: The system may not be configured correctly to handle the specific type of project element.
Solution: To resolve this error, you can take the following steps: Check the ProjectElementID: Verify that the ProjectElementID you are using is exactly 16 characters long. If it is not, correct it to meet the length requirement. Review
Get instant SAP help. Sign up for our Free Essentials Plan.
IVE_E_INVOICE011
For Proj.Elem.-TypeCode 7 length of Proj.Elem.ID cannot be longer than 12
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IVE_E_INVOICE010
For Proj.Elem.-TypeCode 6 length of Proj.Elem.ID cannot be longer than 24
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IVE_E_INVOICE013
ProjectElement-TypeCode &1 is not supported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IVE_E_INVOICE014
ProcessingTypeCode &1 does not allow input in node &2 (invoice item &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.