Do you have any question about this error?
Message type: E = Error
Message class: IS - Equipment management
Message number: 240
Message text: Construction type is automatically set from &2 to &1
Synchronous maintenance of material number and construction type is
intended for this type of equipment in Customizing, or to be more
precise: If the material number is maintained, then the construction
type must have the same value.
The assembly type of the equipment previously had the value &V2&. The
system automatically changes the material number value to &V1&. durch.
Changes to synchronously maintained values can only be made using the
material number. If you do not want this synchronous data storage, you
should either change the type of equipment or change the Customizing
settings.
Error message extract from SAP system. Copyright SAP SE.
IS240
- Construction type is automatically set from &2 to &1 ?The SAP error message IS240, which states "Construction type is automatically set from &2 to &1," typically occurs in the context of project system (PS) or investment management (IM) modules when there is a mismatch or inconsistency in the construction type settings for a project or investment.
Cause:
Inconsistent Data: The error usually arises when the system detects that the construction type assigned to a project or investment is not compatible with the current settings or configurations. This can happen if:
- The project was created with a certain construction type, but the system has rules or settings that dictate a different construction type based on the project’s characteristics or status.
- Changes were made to the project or investment that affect its construction type, leading the system to automatically adjust it.
Configuration Settings: The configuration settings in the project system or investment management may have been altered, leading to a situation where the system needs to adjust the construction type to align with the new settings.
Solution:
Review Project Settings: Check the project or investment settings to ensure that the construction type is appropriate for the current project status and characteristics. You may need to manually adjust the construction type if it is not set correctly.
Check Configuration: Review the configuration settings in the SAP system related to project types and construction types. Ensure that the settings align with the intended use and that there are no conflicting rules.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on construction types and their implications in your project or investment management processes.
User Exits or BAdIs: If the automatic adjustment is not desired, consider implementing user exits or Business Add-Ins (BAdIs) to customize the behavior of the system regarding construction types.
Testing: After making any changes, conduct thorough testing to ensure that the adjustments resolve the issue without introducing new problems.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP project management.
Get instant SAP help. Start your 7-day free trial now.
IS229
Update program: I/O error &; function &, RC= &, key &
What causes this issue? Part of the data that you want to save already exists in the database.System Response INCLUDE 'VERBUCHUNG' OBJECT ...
IS225
UpdateProg.: error &, RC &, no. of records &, no. of inserts &
What causes this issue? INCLUDE 'FEHLER' OBJECT DOKU ID TX LANGUAGE ESystem Response INCLUDE 'VERBUCHUNG' OBJECT DOKU ID TX LANG...
IS241
Construction type is automatically set to &1
What causes this issue? Synchronous maintenance of material number and construction type are intended for this type of equipment in Customizing for P...
IS242
Direct change of construction type is not allowed
What causes this issue? Synchronous maintenance of material number and construction type are intended for this type of equipment in Customizing, or t...
Click on this link to search all SAP messages.