How To Fix IPPECIF199 - Priority of lines in part of line networks is different


IPPECIF199 - Overview

  • Message type: E = Error

  • Message class: IPPECIF - Messages for APO CIP Interfaces in iPPE

  • Message number: 199

  • Message text: Priority of lines in part of line networks is different

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IPPECIF199 - Priority of lines in part of line networks is different ?
    The SAP error message IPPECIF199 indicates that there is a discrepancy in the priority of lines within a part of line networks in the production planning module. This typically occurs when you are trying to create or modify a production order or a planned order that involves line networks, and the system detects that the priority settings for the components or operations are inconsistent.
    
    Cause: Different Priorities: The error arises when the components or operations in a line network have different priority settings. In SAP, each operation or component can be assigned a priority, and these priorities must be consistent across the entire line network.
    Configuration Issues: There may be configuration issues in the line network settings or in the master data of the materials involved. Data Inconsistencies: There could be inconsistencies in the data entered for the production order or planned order, such as incorrect settings in the routing or bill of materials

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant