How To Fix IM039 - Different planner groups, please check data


IM039 - Overview

  • Message type: E = Error

  • Message class: IM - Maintenance notifications

  • Message number: 039

  • Message text: Different planner groups, please check data

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IM039 - Different planner groups, please check data ?
    The SAP error message IM039 ("Different planner groups, please check data") typically occurs in the context of materials management or production planning when there is a mismatch in the planner groups assigned to different materials or planning objects. This can happen during various processes, such as creating or changing a production order, or when trying to perform a planning run.
    
    Cause: Different Planner Groups: The error indicates that the materials or objects involved in the transaction are assigned to different planner groups. Each planner group is associated with specific planning parameters and strategies, and SAP requires consistency in these assignments for certain operations. Master Data Configuration: The master data for the materials (like Material Master, BOM, Routing) may have been set up with different planner groups, leading to this inconsistency. Transaction Data: The transaction data (like production orders or purchase orders) may reference materials with different planner groups.
    Solution: Check Material Master Data: Go to the Material

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant