Do you have any question about this error?
Message type: E = Error
Message class: IF - Messages re interest accounting in PS/CO/IM
Message number: 134
Message text: The hierarchy for this object is incomplete
The hierarchy determined for the relevant object is incomplete.
One of the following applies:
A lower-level WBS element was selected without its higher level
hierarchy
A network or network activity was read without the assigned WBS
element.
A network is assigned directly to a project definition.
In the interest calculation, characteristics from the hierarchy are
inherited by lower level objects. To prevent data breakdowns, objects
with incomplete hierarchy information are not processed.
If possible, use only the project definition to make your selection in
the interest calculation. This ensures that the complete project
hierarchy is selected.
Error message extract from SAP system. Copyright SAP SE.
IF134
- The hierarchy for this object is incomplete ?The SAP error message IF134, which states "The hierarchy for this object is incomplete," typically occurs in the context of SAP's Integrated Planning (IP) or other modules that utilize hierarchical structures, such as Profitability Analysis (CO-PA) or other planning-related functionalities. This error indicates that the system has detected that the hierarchy for a specific object (like a cost center, profit center, or other organizational units) is not fully defined or is missing necessary components.
Causes:
- Missing Hierarchy Nodes: The hierarchy for the object may not include all the necessary nodes or levels. For example, if a cost center is expected to be part of a specific hierarchy but is not assigned correctly, this error can occur.
- Incorrect Hierarchy Structure: The hierarchy may be incorrectly structured, leading to gaps or missing links between nodes.
- Data Inconsistencies: There may be inconsistencies in the master data that prevent the hierarchy from being recognized as complete.
- Configuration Issues: The configuration settings in the SAP system may not be set up correctly, leading to incomplete hierarchies.
Solutions:
- Check Hierarchy Configuration: Review the hierarchy configuration in the relevant module (e.g., Cost Center Accounting, Profitability Analysis) to ensure that all necessary nodes are included and correctly structured.
- Maintain Hierarchy: Use transaction codes like
KSH1
(Create Cost Center Hierarchy) orKSH2
(Change Cost Center Hierarchy) to maintain and update the hierarchy as needed.- Validate Master Data: Ensure that all master data related to the hierarchy is complete and correctly assigned. This includes checking that all relevant objects are created and linked properly.
- Use Transaction Codes for Analysis: Utilize transaction codes such as
KSH3
(Display Cost Center Hierarchy) to analyze the current state of the hierarchy and identify any missing components.- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the hierarchy structure relevant to your module.
- Check for Authorizations: Ensure that you have the necessary authorizations to view and modify the hierarchy settings.
Related Information:
By following these steps, you should be able to identify the cause of the IF134 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
IF133
Specify a project definition, WBS element, or network/activity
What causes this issue? Possible causes: Sender specification incomplete Sender specification unclearSystem Response How to fix this error? You can ...
IF132
No "actual" interest calculation allowed
What causes this issue? Status &V1& is set for <DS:GLOS.balancing_object>balancing object</>. This status does not allow an actua...
IF135
Date incomplete. Complete the date or remove it altogether
What causes this issue? The start/finish date specifications for the interest run are incomplete.System Response INCLUDE NA_ALLG_NOVERARBEITUNG OBJE...
IF136
System could not determine an interest calc.finish date for the object
What causes this issue? No finish date has been maintained for the object. The planned interest calculation uses the scheduled WBS element finish dat...