Do you have any question about this error?
Message type: E = Error
Message class: I0 - Messages for PM tables
Message number: 509
Message text: No address access sequence maintained for plant &1 ord. type &2 object &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
I0509
- No address access sequence maintained for plant &1 ord. type &2 object &3 ?The SAP error message I0509 indicates that there is no address access sequence maintained for a specific plant, order type, and object. This typically occurs in the context of logistics or production planning when the system is trying to retrieve address information for a specific order but cannot find the necessary configuration.
Cause:
The error is caused by the absence of a defined address access sequence for the specified combination of:
&1
): The specific plant where the order is being processed.&2
): The type of order (e.g., production order, purchase order) that is being referenced.&3
): The specific object type related to the order.This means that the system does not know how to retrieve the address information for the given parameters because the necessary configuration has not been set up.
To resolve this error, you need to maintain the address access sequence for the specified plant and order type. Here are the steps to do this:
Access the Configuration:
SPRO -> SAP Reference IMG -> Logistics General -> Address Management -> Define Address Access Sequences
Define Address Access Sequence:
Assign Access Sequence:
Testing:
SPRO
for configuration or SE11
for data dictionary checks.By following these steps, you should be able to resolve the I0509 error and ensure that the system can access the necessary address information for the specified plant and order type.
Get instant SAP help. Start your 7-day free trial now.
I0508
No valid MaintActTypes have been maintained for the order type
What causes this issue? There are no valid <GL:maintenance_activity_type>maintenance activity types</> in your system for the <GL:orde...
I0507
Operating status & is not defined
What causes this issue? You have entered operating status &V1&, which is not defined in your system.System Response INCLUDE 'KEINE-VERA...
I0510
Operation &1 &2 has invalid maintenance activity type
What causes this issue? The combination of <GL:order_type>order type</> and <GL:maintenance_activity_type>maintenance activity type...
I0600
Number of entries (without filtering): &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.