How To Fix HRPBSDEVAVG063 - Start date must lie after the date as of which the reduction takes effect


HRPBSDEVAVG063 - Overview

  • Message type: E = Error

  • Message class: HRPBSDEVAVG - HR-VADM: Public Sector Pensions Act

  • Message number: 063

  • Message text: Start date must lie after the date as of which the reduction takes effect

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message HRPBSDEVAVG063 - Start date must lie after the date as of which the reduction takes effect ?
    The SAP error message HRPBSDEVAVG063 typically occurs in the context of payroll or personnel administration when there is an inconsistency in the dates related to a reduction in pay or benefits. This error indicates that the start date for a specific action (like a pay reduction) must be after the effective date of the reduction.
    
    Cause: The error arises when: You are trying to enter a new record (like a pay change or benefit adjustment) with a start date that is earlier than or the same as the effective date of a previously defined reduction. The system requires that any new changes must take effect after the existing reduction date to maintain logical consistency in payroll processing.
    Solution: To resolve this error, you can take the following steps: Check Dates: Review the effective date of the reduction that is causing the conflict. Ensure that the start date of the new action you are trying to enter is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker