Do you have any question about this error?
Message type: E = Error
Message class: GU - FI-SL utilities
Message number: 220
Message text: & &/&/&: Planning not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GU220
- & &/&/&: Planning not possible ?The SAP error message GU220, which states "Planning not possible," typically occurs in the context of production planning or materials management. This error can arise due to various reasons, and understanding the cause is essential for finding an appropriate solution. Here are some common causes and their corresponding solutions:
Causes of GU220 Error
Missing Master Data: The required master data (like material master, BOM, routing, etc.) may not be set up correctly or may be missing.
Incorrect Planning Parameters: The planning parameters in the configuration may not be set correctly, leading to issues in the planning process.
Locked or Inactive Materials: The material you are trying to plan may be locked or marked as inactive in the system.
Planning Version Issues: The planning version you are using may not be active or may not have the necessary data.
Capacity Constraints: There may be capacity constraints in the production resources that prevent planning from occurring.
Date Issues: The planning date may be outside the permissible range or may not align with the production calendar.
Solutions to GU220 Error
Check Master Data:
- Ensure that the material master data is complete and accurate.
- Verify that the BOM and routing are correctly defined and active.
Review Planning Parameters:
- Check the planning parameters in the configuration settings to ensure they are set correctly for your planning scenario.
Material Status:
- Check the status of the material in the system. If it is locked or inactive, you may need to unlock or activate it.
Planning Version:
- Ensure that the planning version you are using is active and contains the necessary data for planning.
Capacity Check:
- Review the capacity of production resources to ensure there are no constraints that would prevent planning.
Date Validation:
- Verify that the planning date is within the acceptable range and aligns with the production calendar.
Related Information
MD01
, MD02
, or MD03
for planning runs, and MM03
for checking material master data.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
GU219
One of the three fields &, & or & must be a key in the database &
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
GU218
& &/&/&: Actual posting not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GU221
The versions of ledger & are not defined correctly
What causes this issue? Ledger version &V2& is not a translation version or is not assigned a exchange rate version. This is necessary in ord...
GU222
Summary table & has not been defined correctly (see ledger &)
What causes this issue? The summary table assigned to the ledger was not found in the table directory.System Response The system cancels processing....
Click on this link to search all SAP messages.