How To Fix GRC01012 - Cost estimate (&1 / &2 / &3) does not exist


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GRC01 - Messages for goods receipt costing

  • Message number: 012

  • Message text: Cost estimate (&1 / &2 / &3) does not exist

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GRC01012 - Cost estimate (&1 / &2 / &3) does not exist ?

    The SAP error message GRC01012 indicates that a cost estimate for a specific combination of parameters (typically related to a material or service) does not exist in the system. This error is often encountered in the context of SAP's Controlling (CO) module, particularly when dealing with cost estimates in the context of project management, production planning, or material management.

    Cause:

    1. Missing Cost Estimate: The most common cause is that the cost estimate for the specified object (material, service, or project) has not been created or has been deleted.
    2. Incorrect Parameters: The parameters used to retrieve the cost estimate (like the version, date, or plant) may be incorrect or do not match any existing cost estimates.
    3. Authorization Issues: The user may not have the necessary authorizations to view the cost estimate.
    4. Data Consistency Issues: There may be inconsistencies in the data, such as missing master data or configuration settings.

    Solution:

    1. Create a Cost Estimate: If the cost estimate does not exist, you will need to create one. This can typically be done using transaction codes like CK11N (Create Cost Estimate with Quantity Structure) or CK40N (Create Cost Estimate for Material).
    2. Check Parameters: Verify that the parameters you are using to access the cost estimate are correct. Ensure that the version, date, and other relevant fields are set correctly.
    3. Authorization Check: Ensure that the user has the necessary authorizations to access the cost estimate. This may involve checking user roles and permissions in the SAP system.
    4. Data Consistency Check: Perform a data consistency check to ensure that all necessary master data (like material master, cost center, etc.) is in place and correctly configured.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on creating and managing cost estimates.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CK11N, CK40N, and CK24 (Display Cost Estimate).
    • Costing Variants: Understand the costing variants and how they affect the creation and retrieval of cost estimates.
    • SAP Notes: Check SAP Notes for any known issues or patches related to cost estimates and the GRC01012 error.
    • Training and Support: If you are unsure about the process, consider reaching out to your SAP support team or consulting SAP training resources for further assistance.

    By following these steps, you should be able to resolve the GRC01012 error and ensure that the necessary cost estimates are available in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author