Message type: E = Error
Message class: GPSC - PSC Application
Message number: 247
Message text: Total Equity Group % for Company & PSC & Equity Group & greater than 100
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GPSC247
- Total Equity Group % for Company & PSC & Equity Group & greater than 100 ?The SAP error message GPSC247 indicates that the total equity group percentage for a specific company, PSC (Production Sharing Contract), and equity group exceeds 100%. This error typically arises in the context of managing equity distributions in joint ventures or partnerships, where the total ownership percentages must logically sum to 100% or less.
Cause: Data Entry Error: The most common cause is incorrect data entry where the equity percentages for the various partners or stakeholders have been input incorrectly, leading to a total that exceeds 100%.
Configuration Issues: There may be issues in the configuration of the equity groups or the way percentages are calculated within the system. Changes in Ownership: If there have been recent changes in ownership stakes that have not been updated in the system, this could lead to discrepancies. Multiple Entries: Sometimes, multiple entries for the same equity group can lead to inflated totals.
Solution: Review Equity Percentages: Check the equity percentages assigned
Get instant SAP help. Sign up for our Free Essentials Plan.
GPSC246
Total Equity Group % for Company &1 PSC &2 Equity Group &3 less than 100
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPSC245
Posting Period & not valid in Company Code &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPSC248
Production date cannot be in the future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPSC255
Lifting record has already been split. Consider if changes are required
What causes this issue? Lifting record has already been split. Please make sure that changes are really requiredSystem Response The system issues an...
Click on this link to search all SAP messages.