Do you have any question about this error?
Message type: E = Error
Message class: GPSC - PSC Application
Message number: 020
Message text: Quantity must be less than the succeeding step & quantity of &
Error message extract from SAP system. Copyright SAP SE.
GPSC020
- Quantity must be less than the succeeding step & quantity of & ?The SAP error message GPSC020, which states "Quantity must be less than the succeeding step & quantity of &," typically occurs in the context of SAP's Advanced Planning and Optimization (APO) or similar modules where planning and scheduling are involved. This error indicates that the quantity specified in a particular step exceeds the quantity allowed in the subsequent step, which can disrupt the planning process.
Cause:
- Incorrect Quantity Input: The quantity entered for a specific step in a production or planning process is greater than the quantity defined for the next step.
- Configuration Issues: There may be issues with the configuration of the planning steps, such as incorrect settings in the routing or production version.
- Data Integrity Issues: There could be inconsistencies in the master data, such as BOM (Bill of Materials) or routing data, leading to mismatched quantities.
- Planning Parameters: The planning parameters set for the product or process may not align with the actual production capabilities or constraints.
Solution:
- Review Quantity Inputs: Check the quantities entered for the steps in the planning process. Ensure that the quantity for the current step is less than the succeeding step's quantity.
- Adjust Planning Steps: If necessary, adjust the planning steps or the quantities defined in the routing or production version to ensure they are consistent.
- Check Master Data: Review the master data related to the product, including BOM and routing, to ensure that all quantities are correctly defined and aligned.
- Consult Configuration Settings: If the issue persists, consult with your SAP configuration team to review the settings related to the planning process and ensure they are correctly configured.
- Testing: After making adjustments, test the planning process again to ensure that the error does not reoccur.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/MC90
(for planning book) to analyze the planning data.If the problem continues after following these steps, it may be beneficial to engage with SAP support or your internal SAP team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
GPSC019
This value is not within the & value range.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPSC018
The Company Code must be a Joint Venture if the source is 'JV'.
What causes this issue? The company code entered is not defined in Joint Venture even though the source is 'JV'.System Response Can not co...
GPSC021
Quantity must be greater than the proceeding step & quantity of &
What causes this issue? You have entered a value that is greater than the value of the succeeding step. Each step represents the upper limit value fo...
GPSC022
Ledger 4A does not exist for &, therefore this entry is not valid
What causes this issue? Ledger '4A' does not exist for processed company codeSystem Response Could not continue processHow to fix this err...
Click on this link to search all SAP messages.