How To Fix GPDPEG251 - Save: Missing plant for group &2 replen &3 material &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GPDPEG - A&D GPD message classed used by Pegging only

  • Message number: 251

  • Message text: Save: Missing plant for group &2 replen &3 material &4

  • Show details Hide details
  • What causes this issue?

    Plant is missing on an assignment about to be saved.
    Grouping WBS element: &V2&
    Replenishment object: &V3&
    Material: &V4&

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Possible cause is an incorrect BAdI implementation.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GPDPEG251 - Save: Missing plant for group &2 replen &3 material &4 ?

    The SAP error message GPDPEG251 indicates that there is a missing plant assignment for a specific material in the context of a replenishment group. This error typically arises in the context of materials management and inventory management processes, particularly when dealing with planning and replenishment strategies.

    Cause:

    The error occurs when:

    1. A material is not assigned to a plant in the system.
    2. The replenishment group is trying to process a material that does not have a valid plant assignment.
    3. The configuration for the material or the replenishment group is incomplete or incorrect.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Material Master Data:

      • Go to the Material Master (Transaction Code: MM03).
      • Enter the material number and check if the plant is assigned under the relevant views (e.g., Basic Data, Purchasing, MRP).
      • If the plant is missing, you need to create or update the material master record to include the relevant plant.
    2. Check Replenishment Group Configuration:

      • Ensure that the replenishment group is correctly configured and that it includes the necessary plants.
      • You can check this in the configuration settings for the replenishment group (Transaction Code: OMPA or similar).
    3. Assign Plant to Material:

      • If the material is not assigned to any plant, you can assign it by creating a new plant-specific material master record or extending the existing one to include the plant.
    4. Review Planning Parameters:

      • Ensure that the planning parameters for the material are correctly set up, including the MRP type and other relevant settings.
    5. Consult Documentation:

      • If you are unsure about the configuration or the steps to take, refer to SAP documentation or consult with your SAP support team for guidance.

    Related Information:

    • Transaction Codes:
      • MM03: Display Material Master
      • MM02: Change Material Master
      • OMPA: Configuration for Replenishment Groups
    • SAP Notes:
      • Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • User Roles:
      • Ensure that you have the necessary authorizations to make changes to the material master and replenishment group settings.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker