Do you have any question about this error?
Message type: E = Error
Message class: GPD - Pegging & Distribution
Message number: 084
Message text: GPD entries exist; change to WBS not allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GPD084
- GPD entries exist; change to WBS not allowed ?The SAP error message GPD084 indicates that there are existing General Project Data (GPD) entries associated with a project, and as a result, the system does not allow changes to the Work Breakdown Structure (WBS) element. This typically occurs when you attempt to change a WBS element that has already been linked to GPD entries, which are used for project management and tracking.
Cause:
- Existing GPD Entries: The primary cause of this error is that there are already GPD entries associated with the WBS element you are trying to change. These entries may include various project-related data that are critical for project tracking and reporting.
- Data Integrity: SAP enforces this restriction to maintain data integrity and ensure that changes do not disrupt existing project data and reporting structures.
Solution:
To resolve the GPD084 error, you can consider the following steps:
Review GPD Entries: Check the existing GPD entries associated with the WBS element. You can do this by navigating to the relevant project in SAP and reviewing the GPD data.
Delete or Modify GPD Entries: If it is appropriate, you may need to delete or modify the existing GPD entries before attempting to change the WBS element. Ensure that any changes made do not affect the overall project integrity.
Create a New WBS Element: If the changes you want to make are significant and cannot be accommodated by modifying the existing GPD entries, consider creating a new WBS element instead of changing the existing one.
Consult with Project Management: If you are unsure about the implications of deleting or modifying GPD entries, consult with your project management team or SAP administrator to ensure that you are following the correct procedures.
Check Authorization: Ensure that you have the necessary authorizations to make changes to GPD entries and WBS elements. Lack of proper authorization can also lead to errors.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change WBS Element) to view and manage WBS elements and GPD entries.By following these steps, you should be able to address the GPD084 error and proceed with your project management tasks in SAP.
Get instant SAP help. Start your 7-day free trial now.
GPD083
Material & does not exist in plant &. Purchase order possibly incorrect
What causes this issue? During pegging the program found a material that has not been defined in the material master for the plant.System Response T...
GPD082
Inconsistency: Group-to-group transfer is only for in-stock quantity
What causes this issue? A planned replenishment object has been transferred between groups, however the affected object was not in stock. Group-to-gr...
GPD085
You cannot assign independent requirements to grouping WBS elements
What causes this issue? You are trying to assign a primary material requirement to a grouping WBS element.System Response The system does not allow ...
GPD086
GPD entries exist, deletion not possible
What causes this issue? You are trying to delete a WBS element using GPD functionality.System Response System cannot continue processing.How to fix ...
Click on this link to search all SAP messages.