Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: GM - Combination manager
Message number: 059
Message text: CCtr/actvty type &/& = sender CCtr/actvty type is not supported
Within performance-related activity input planning, it is not permitted
for a cost center to include an activity for creating the same activity.
The planning of &V1&/&V2& --> &V1&/&V2& is rejected.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GM059
- CCtr/actvty type &/& = sender CCtr/actvty type is not supported ?The SAP error message GM059 indicates that there is an issue with the configuration of the controlling area or the activity type in the context of the General Ledger (G/L) accounting or internal orders. Specifically, the error message states that the sender cost center or activity type is not supported for the transaction you are trying to execute.
Cause:
- Incorrect Configuration: The cost center or activity type may not be properly configured in the controlling area. This could be due to missing settings or incorrect assignment of the cost center/activity type to the controlling area.
- Incompatible Transaction: The transaction you are trying to perform may not be compatible with the specified cost center or activity type. For example, certain transactions may only be allowed for specific types of cost centers or activity types.
- Master Data Issues: The master data for the cost center or activity type may be incomplete or incorrect, leading to the error.
- Authorization Issues: The user may not have the necessary authorizations to perform the transaction with the specified cost center or activity type.
Solution:
Check Configuration:
- Go to the configuration settings for the controlling area and verify that the cost center and activity type are correctly defined and assigned.
- Ensure that the cost center/activity type is active and valid for the period in which you are trying to execute the transaction.
Review Master Data:
- Check the master data for the cost center and activity type to ensure that all required fields are filled out correctly.
- Make sure that the cost center/activity type is assigned to the correct controlling area.
Transaction Compatibility:
- Verify that the transaction you are trying to execute is compatible with the cost center or activity type. Consult the SAP documentation or your internal guidelines to confirm this.
Authorization Check:
- Ensure that the user executing the transaction has the necessary authorizations to work with the specified cost center or activity type. If not, contact your SAP security administrator to request the appropriate access.
Consult SAP Notes:
- Check for any relevant SAP Notes that may address this specific error message. SAP frequently updates its knowledge base with solutions to common issues.
Related Information:
KS01
(Create Cost Center), KS02
(Change Cost Center), and KS03
(Display Cost Center) to manage cost centers.By following these steps, you should be able to identify and resolve the cause of the GM059 error message in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
GM058
Unknown error set
What causes this issue? During master data validation, a module encountered an error without issuing a message.System Response The system continues ...
GM057
Version & is not permitted for planning
What causes this issue? You want to use version &V1& in the controlling area for a planning transaction. The indicator 'Record planning...
GM060
Settlement cost element & is not supported in primary cost planning
What causes this issue? Cost element &V1& is a cost element that is used for external order settlement (for example, settlement to a G/L acco...
GM061
Reserves & are not supported in primary cost planning
What causes this issue? Cost element &V1& is a provision. Provisions are special cost elements that are not taken into account within primary...
Click on this link to search all SAP messages.