Message type: E = Error
Message class: GM - Combination manager
Message number: 006
Message text: Primary cost planning on order & not supported
The status of an order decides which activities are allowed for it. In
addition, you can enter a blocking group which blocks certain
activities for this order individually. An activity may only be
performed for an order if the status allows it and if it does not belong
to the group of blocked activities.
Primary cost planning is not allowed for order &V1&.
To plan the order &V1&, you must set a status that allows the activity
RKP1 ('CO planning costs'), and the order must not be blocked against
this activity.
Error message extract from SAP system. Copyright SAP SE.
GM006
- Primary cost planning on order & not supported ?The SAP error message GM006 ("Primary cost planning on order & not supported") typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost planning for orders in the context of the Grants Management (GM) module. This error indicates that the system does not support primary cost planning for the specified order type.
Cause:
- Order Type Configuration: The order type you are trying to use may not be configured to allow primary cost planning. This can happen if the order type is set up for a specific purpose that does not include primary cost planning.
- Integration Issues: There may be integration issues between the Grants Management module and the Controlling module, leading to restrictions on how costs can be planned.
- System Settings: The system settings or parameters may not allow for primary cost planning on the specific order type you are working with.
Solution:
Check Order Type Configuration:
- Go to the configuration settings for the order type in the SAP system (Transaction code: OPL8).
- Ensure that the order type is set up to allow primary cost planning. If not, you may need to adjust the configuration or use a different order type that supports this functionality.
Review Integration Settings:
- Check the integration settings between the Grants Management and Controlling modules to ensure that they are correctly configured.
- Ensure that the necessary settings for cost planning are enabled in both modules.
Consult Documentation:
- Review SAP documentation or notes related to the GM006 error message for any specific guidance or updates that may apply to your version of SAP.
Use Alternative Planning Methods:
- If primary cost planning is not supported for the order type, consider using alternative planning methods that are allowed, such as secondary cost planning or using a different order type that supports primary cost planning.
Contact SAP Support:
- If the issue persists after checking the configuration and settings, consider reaching out to SAP support for further assistance. They may provide insights specific to your system configuration or version.
Related Information:
By following these steps, you should be able to identify the cause of the GM006 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
GM005
Primary cost planning in cost center & is not supported
What causes this issue? The cost center &V1& that you want to plan is blocked for primary cost planning. The block was set in the master rec...
GM004
Secondary cost postings to order & not supported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GM007
Secondary cost planning in cost center & is not supported
What causes this issue? You want to plan cost center &V1&, but it is blocked against secondary cost planning. The block was set in the master...
GM008
Secondary cost planning on order & not supported
What causes this issue? The status of an order decides which activities are allowed. In addition, you can enter a blocking group that blocks certain...
Click on this link to search all SAP messages.