Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: GH - Help functions and tools in FI-SL
Message number: 112
Message text: Ledger & is not a day ledger
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message GH112 indicates that the specified ledger is not recognized as a day ledger. This error typically arises in the context of financial accounting and controlling when there is an attempt to perform operations that require a day ledger, but the ledger in question is not configured as such.
Cause: Incorrect Ledger Configuration: The ledger you are trying to use may not be set up as a day ledger in the system. Data Entry Error: There might be a typographical error in the ledger name or code being referenced. System Settings: The system settings or parameters may not be correctly configured to recognize the ledger as a day ledger. Version or Upgrade Issues: If the system has been recently upgraded or patched, there may be inconsistencies in the configuration.
Solution: Check Ledger Configuration: Go to the configuration settings in SAP and verify that the ledger is correctly set up as a day ledger. You can check
Get instant SAP help. Sign up for our Free Essentials Plan.
GH111 Ledger & contains data for global company &
What causes this issue? Data has already be posted to ledger &V1& for global company &V2&.System Response The system issues an error...
GH110 Ledger & contains data for company code &
What causes this issue? Data has already been posted in ledger &V1& for company code &V2&.System Response The system issues an error...
GH113 The drilldown report must be selected using one ledger
What causes this issue? Drilldown reports must be selected using precisely one ledger. Here, the drilldown report called up has no ledger selections ...
GH114 The selection conditions entered cover more than one fiscal year
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.