Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 798
Message text: No cost-based Profitability Analysis active in controlling area &.
For the function "Set profitability segment", you chose costing-based
Profitability Analysis. However, this is not active for controlling
area &V1& in fiscal year &V2&.
The function was not executed.
Check your settings.
Error message extract from SAP system. Copyright SAP SE.
GA798
- No cost-based Profitability Analysis active in controlling area &. ?The SAP error message GA798 indicates that there is no cost-based Profitability Analysis (CO-PA) active in the specified controlling area. This error typically arises when you attempt to perform operations related to Profitability Analysis without having the necessary configuration in place.
Cause:
- Inactive Cost-Based CO-PA: The controlling area you are working with does not have cost-based Profitability Analysis activated.
- Configuration Issues: The configuration settings for the controlling area may not have been completed or may be incorrect.
- Missing Authorization: The user may not have the necessary authorizations to access or activate cost-based Profitability Analysis.
Solution:
To resolve the GA798 error, follow these steps:
Activate Cost-Based CO-PA:
- Go to the SAP Easy Access screen.
- Navigate to SPRO (SAP Project Reference Object) ? Enterprise Structure ? Definition ? Controlling ? Activate Profitability Analysis.
- Ensure that the cost-based Profitability Analysis is activated for the relevant controlling area.
Check Configuration:
- Verify that the controlling area is correctly configured for CO-PA.
- Ensure that the necessary settings for cost elements, operating concern, and other related configurations are in place.
Review Authorizations:
- Check if the user has the necessary authorizations to access and work with CO-PA.
- If not, consult with your SAP security team to grant the required permissions.
Consult Documentation:
- Review SAP documentation or help files related to Profitability Analysis for any additional configuration steps that may be required.
Testing:
- After making the necessary changes, perform a test transaction to ensure that the error no longer occurs.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP consultant or your internal SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GA797
Maximum of 9999 receiver weighting factors possible.
What causes this issue? In a cycle segment, you defined more than 9999 receiver weighting factors. However, no more than 9999 factors may be stored i...
GA796
Reference basis "Variable portions" for special periods is not supported.
What causes this issue? Cost center costs from special periods are to be tranferred. In cycle &V1&, "Variable portions" is given as...
GA799
No accounting-based Profitability Analysis active in controlling area &.
What causes this issue? For the function "Set profitability segment", you chose account-based Profitability Analysis. However, this is not ...
GA800
*********Error Display ***************** *********************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.