Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 797
Message text: Maximum of 9999 receiver weighting factors possible.
In a cycle segment, you defined more than 9999 receiver weighting
factors. However, no more than 9999 factors may be stored in the d
atabase.
Only the first 9999 receiver weighting factors will be stored in the
database. The additional values will not be stored and will be lost.
Change the definition of your receiver criteria such that no more than
9999 receivers are defined.
Error message extract from SAP system. Copyright SAP SE.
GA797
- Maximum of 9999 receiver weighting factors possible. ?The SAP error message GA797, which states "Maximum of 9999 receiver weighting factors possible," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with activity allocation or distribution processes. This error indicates that the system has reached the maximum limit of 9999 receiver weighting factors that can be assigned in a single allocation or distribution run.
Cause:
The error is caused by attempting to allocate costs or resources to more than 9999 receivers in a single allocation run. Each receiver can have a weighting factor, and if the total number of receivers exceeds this limit, the system will throw this error.
Solution:
To resolve this error, you can consider the following approaches:
Split the Allocation: If you have a large number of receivers, consider splitting the allocation into multiple runs. For example, you can group receivers into smaller batches, ensuring that each batch does not exceed the 9999 limit.
Review Receiver Assignment: Check if all the receivers are necessary for the allocation. If there are any receivers that can be excluded or consolidated, do so to reduce the total count.
Use Alternative Allocation Methods: Depending on your business process, you might explore using different allocation methods or techniques that do not require as many receivers.
Adjust Weighting Factors: If applicable, review the weighting factors assigned to each receiver. Ensure that they are correctly set and that there are no unnecessary entries.
Consult SAP Documentation: Review the SAP documentation or help resources for any specific guidelines or best practices related to your version of SAP and the allocation process you are using.
Contact SAP Support: If the issue persists and you cannot find a suitable workaround, consider reaching out to SAP support for assistance. They may provide insights specific to your system configuration or version.
Related Information:
By following these steps, you should be able to address the GA797 error and continue with your allocation processes in SAP.
Get instant SAP help. Start your 7-day free trial now.
GA796
Reference basis "Variable portions" for special periods is not supported.
What causes this issue? Cost center costs from special periods are to be tranferred. In cycle &V1&, "Variable portions" is given as...
GA795
Cycle & was not reversed. Line items not available
What causes this issue? Cycle &V1& could not be reversed in period &V2&. In Profitability Analysis, the line items with reference doc...
GA798
No cost-based Profitability Analysis active in controlling area &.
What causes this issue? For the function "Set profitability segment", you chose costing-based Profitability Analysis. However, this is not ...
GA799
No accounting-based Profitability Analysis active in controlling area &.
What causes this issue? For the function "Set profitability segment", you chose account-based Profitability Analysis. However, this is not ...
Click on this link to search all SAP messages.