Message type: E = Error
Message class: GA - Allocations
Message number: 604
Message text: No clear receiver defined in cycle & , start date & , segment & .
In cycle &V1&, starting date &V2& you made a non-specific entry in
segment &V3& for the receivers in field &V4&. Field &V4& is defined
with a range for both the receiver and the reference bases. It is thus
not possible to specifically assign the reference bases to a receiver.
Processing cannot be carried out.
Check the definition of the receiver in segment &V3& with reference to
field &v4&.
Error message extract from SAP system. Copyright SAP SE.
GA604
- No clear receiver defined in cycle & , start date & , segment & . ?The SAP error message GA604 indicates that there is no clear receiver defined in a cycle for a given start date and segment. This error typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with internal orders, cost centers, or profit centers.
Cause:
Missing Receiver Assignment: The most common cause of this error is that the system cannot find a valid receiver for the specified cycle. This could be due to:
- The receiver (cost center, internal order, etc.) not being defined in the cycle.
- The receiver being inactive or not available for the specified period.
- Incorrect configuration of the allocation cycle.
Incorrect Cycle Configuration: The cycle may not be properly set up, leading to the system being unable to determine where to allocate costs.
Date Issues: The start date specified may not align with the periods defined in the cycle, leading to a situation where no valid receiver can be found.
Solution:
Check Cycle Configuration:
- Go to the cycle definition in the SAP system (Transaction code: KSV5 for cycles).
- Ensure that the receiver is correctly defined in the cycle.
- Verify that the cycle is active and that the receiver is valid for the specified period.
Review Receiver Assignment:
- Check if the receiver (cost center, internal order, etc.) is correctly assigned and active.
- Ensure that the receiver exists in the system and is not marked for deletion or inactive.
Adjust Dates:
- Verify the start date and ensure it falls within the valid periods for the cycle.
- If necessary, adjust the start date or the cycle configuration to align with the intended allocation periods.
Run Consistency Checks:
- Use transaction codes like KSV1 (for cycles) to check for any inconsistencies in the configuration.
- You can also run reports to identify any missing assignments or configuration issues.
Consult Documentation:
- Review SAP documentation or help files related to the specific cycle and allocation process to ensure all steps are followed correctly.
Related Information:
Transaction Codes:
SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
User Roles and Authorizations: Ensure that the user has the necessary authorizations to view and modify the allocation cycles and related objects.
By following these steps, you should be able to identify the root cause of the GA604 error and implement the necessary corrections to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GA603
System error : Read error in set & for Table &
What causes this issue? Set &V1& entered in cycle &V3& does not exist.System Response Set &V1& cannot be processed.How to fi...
GA602
Only cycles for exactly one controlling area may be executed together.
What causes this issue? Multiple cycles are to be run, but the senders defined in the cycles belong to different controlling areas.How to fix this er...
GA605
Non-specific sender definition in cycle & segment &
What causes this issue? In cycle &V1&, starting date &V3& you made a non-specific entry in the segment &V2& for the senders i...
GA606
Set & is locked by another user.
What causes this issue? For the execution of assessments, distributions, periodic repostings or indirect activity allocations, all relevant business ...
Click on this link to search all SAP messages.