Message type: E = Error
Message class: GA - Allocations
Message number: 526
Message text: The report to be generated is locked for other processing
User &V1& is working on the report you called up.
Your report has not been generated to prevent you from overwriting user
&V1&'s data.
Choose another name for your report or contact user &V1&.
Error message extract from SAP system. Copyright SAP SE.
GA526
- The report to be generated is locked for other processing ?The SAP error message GA526, which states "The report to be generated is locked for other processing," typically occurs when a report or a transaction is being accessed or processed by another user or session. This locking mechanism is in place to prevent data inconsistencies and ensure that reports are generated correctly without interference. Causes: Concurrent Access: Another user or session is currently generating or processing the same report. Long-Running Processes: A report or transaction is taking a long time to complete, causing a lock on the report. System Configuration: Certain configurations in the SAP system may lead to locking issues, especially if the report is designed to be run in a specific way. Background Jobs: If a background job is running that involves the same report, it may lock the report for other users. Solutions: Wait and Retry: If the report is being processed by another user, wait for a few moments and then try to
Get instant SAP help. Sign up for our Free Essentials Plan.
GA525
Enter an allocation group
What causes this issue? You have not entered an allocation group.System Response No further processing is possible.How to fix this error? Enter an ...
GA524
Indirect activity allocation not allowed with posting; planning locked.
What causes this issue? You started indirect activity allocation with posting. This may call up data records already maintained by user &V1& ...
GA527
Enter a cycle
What causes this issue? You have called up &V1& to be run without specifying the cycle to be processed.System Response Processing cannot be ...
GA528
Cycle & is not valid for complete period
What causes this issue? Cycle &V1&, starting date V2& is only valid until &V3&. You have selected a period ending on &V4&...
Click on this link to search all SAP messages.