    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message G5244 - Exactly one network must be defined if activities are specified. ?

    The SAP error message G5244, "Exactly one network must be defined if activities are specified," typically occurs in the context of project management or production planning within SAP, particularly when working with networks in the Project System (PS) module or in the context of production orders.

    Cause:

    This error arises when you are trying to create or modify a project or production order that includes activities, but you have not specified a network. In SAP, a network is a collection of activities that are linked together to represent a project or a process. If you specify activities without defining a network, SAP cannot determine how to organize or execute those activities, leading to this error.

    Solution:

    To resolve this error, you need to ensure that you have defined exactly one network for the project or order in question. Here are the steps you can take:

    1. Define a Network:

      • Go to the transaction code CN21 (Create Network) or CN22 (Change Network).
      • Create a new network or modify an existing one to include the necessary activities.
    2. Link Activities to the Network:

      • Ensure that the activities you want to include are properly linked to the network you have defined.
      • You can do this in the network screen by adding activities and specifying their relationships.
    3. Check for Existing Networks:

      • If you believe a network has already been defined, double-check that it is correctly assigned to the project or order you are working with.
      • Use transaction code CJ20N (Project Builder) to view and manage project structures, including networks.
    4. Review Project Settings:

      • Ensure that the project settings allow for the use of networks and that there are no configuration issues preventing the network from being recognized.
    5. Consult Documentation:

      • If you are unsure about how to create or manage networks, refer to SAP documentation or user guides specific to the Project System module.

    Related Information:

    • Transaction Codes:

      • CN21: Create Network
      • CN22: Change Network
      • CJ20N: Project Builder
      • CJ01: Create Work Breakdown Structure (WBS)
    • SAP Modules:

      • This error is primarily related to the Project System (PS) module, but it can also occur in production planning contexts.
    • User Roles:

      • Ensure that you have the necessary authorizations to create and modify networks and activities in SAP.

    By following these steps, you should be able to resolve the G5244 error and successfully define the necessary network for your activities. If the problem persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author