Do you have any question about this error?
Message type: E = Error
Message class: G4 - EC-CS Consolidation
Message number: 039
Message text: Severe error in JV-Planintegration - posting not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
G4039
- Severe error in JV-Planintegration - posting not possible ?The SAP error message G4039, which indicates a "Severe error in JV-Plan integration - posting not possible," typically arises in the context of Joint Venture (JV) accounting when there is an issue with the integration between the Joint Venture module and the planning or budgeting module. This error can prevent users from posting transactions related to joint ventures.
Causes:
- Configuration Issues: Incorrect configuration settings in the Joint Venture module or the planning module can lead to integration errors.
- Data Inconsistencies: Mismatches or inconsistencies in master data (e.g., cost centers, internal orders) or transaction data can trigger this error.
- Missing Authorizations: Users may lack the necessary authorizations to perform certain actions related to JV postings.
- Technical Issues: Bugs or issues in the SAP system, such as problems with the underlying database or application logic, can also cause this error.
- Plan Data Issues: If the planning data is not correctly set up or if there are issues with the planning version being used, it can lead to posting failures.
Solutions:
- Check Configuration: Review the configuration settings for the Joint Venture and planning modules to ensure they are correctly set up. This includes checking the integration settings and ensuring that all necessary parameters are defined.
- Validate Master Data: Ensure that all relevant master data is consistent and correctly maintained. This includes checking cost centers, internal orders, and any other relevant entities.
- Review Authorizations: Verify that the user attempting the posting has the necessary authorizations to perform the action. This may involve checking user roles and permissions.
- Analyze Logs: Check the application logs (transaction SLG1) for more detailed error messages that can provide insights into the specific cause of the issue.
- Consult SAP Notes: Look for relevant SAP Notes that may address known issues related to this error. SAP frequently releases updates and patches that can resolve specific problems.
- Test with Different Data: If possible, try to replicate the issue with different sets of data to determine if the problem is data-specific.
- Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP Support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the G4039 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
G4038
Subcontracted material & has wrong recovery indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
G4037
Subcontracted material & has wrong equity group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
G4040
Company & is not maintained in JV Customizing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
G4041
Split values might be higher than original value
The total of all basis values is smaller than the value of one basis line. This will result in a split values which is higher than the original value...
Click on this link to search all SAP messages.