Do you have any question about this error?
Message type: E = Error
Message class: G0 - Messages for SAP Consolidation
Message number: 630
Message text: Assign an activity to sequence number &1 also
Assign each existing activity to a sequence number.
Error message extract from SAP system. Copyright SAP SE.
G0630
- Assign an activity to sequence number &1 also ?The SAP error message G0630, which states "Assign an activity to sequence number &1," typically occurs in the context of project management or production planning within SAP. This error indicates that there is a missing assignment of an activity to a specific sequence number in a project or production order.
Cause:
- Missing Activity Assignment: The most common cause is that an activity has not been assigned to the specified sequence number in the project or production order.
- Incorrect Configuration: There may be issues with the configuration of the project or production order that prevent the assignment from being recognized.
- Data Inconsistencies: There could be inconsistencies in the data entered, such as incorrect sequence numbers or missing entries in related tables.
Solution:
Check Activity Assignment:
- Navigate to the project or production order where the error occurred.
- Verify that all required activities are assigned to the correct sequence numbers.
- If an activity is missing, assign it to the specified sequence number.
Review Configuration:
- Ensure that the configuration settings for the project or production order are correct.
- Check if the sequence numbers are set up properly in the system.
Data Validation:
- Validate the data entered in the project or production order.
- Look for any discrepancies or missing information that could lead to this error.
Use Transaction Codes:
- Use transaction codes like
CJ20N
(Project Builder) for projects orCO02
(Change Production Order) for production orders to review and make necessary adjustments.Consult Documentation:
- Refer to SAP documentation or help files for specific guidance on handling this error in your version of SAP.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CJ20N
, CO02
, or CJI3
(Project Actual Line Items).By following these steps, you should be able to identify the cause of the G0630 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
G0629
Period ranges overlap
What causes this issue? Period ranges overlap in the following consolidation frequencies: &V1&System Response The system issues an error mes...
G0628
The from-period is greater than the to-period
What causes this issue? In the range of periods that you entered, the from-period (&V1&) is greater then the to-period (&V2&).System ...
G0631
Investment data is missing for activity/investee = &1&2&3
What causes this issue? No investment entries (activity/investee) exist for the following activities, which were triggered by equity entries: &V1...
G0632
Cons unit &1 is not assigned to cons group &2
What causes this issue? The <DS:GLOS.consolidation_unit>consolidation unit</> &V1& is not assigned to <DS:GLOS.consolidation_g...
Click on this link to search all SAP messages.