Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: G0 - Messages for SAP Consolidation
Message number: 630
Message text: Assign an activity to sequence number &1 also
Assign each existing activity to a sequence number.
Error message extract from SAP system. Copyright SAP SE.
G0630
- Assign an activity to sequence number &1 also ?The SAP error message G0630, which states "Assign an activity to sequence number &1," typically occurs in the context of project management or production planning within SAP. This error indicates that there is a missing assignment of an activity to a specific sequence number in a project or production order.
Cause:
- Missing Activity Assignment: The most common cause is that an activity has not been assigned to the specified sequence number in the project or production order.
- Incorrect Configuration: There may be issues with the configuration of the project or production order that prevent the assignment from being recognized.
- Data Inconsistencies: There could be inconsistencies in the data entered, such as incorrect sequence numbers or missing entries in related tables.
Solution:
Check Activity Assignment:
- Navigate to the project or production order where the error occurred.
- Verify that all required activities are assigned to the correct sequence numbers.
- If an activity is missing, assign it to the specified sequence number.
Review Configuration:
- Ensure that the configuration settings for the project or production order are correct.
- Check if the sequence numbers are set up properly in the system.
Data Validation:
- Validate the data entered in the project or production order.
- Look for any discrepancies or missing information that could lead to this error.
Use Transaction Codes:
- Use transaction codes like
CJ20N
(Project Builder) for projects orCO02
(Change Production Order) for production orders to review and make necessary adjustments.Consult Documentation:
- Refer to SAP documentation or help files for specific guidance on handling this error in your version of SAP.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CJ20N
, CO02
, or CJI3
(Project Actual Line Items).By following these steps, you should be able to identify the cause of the G0630 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
G0629
Period ranges overlap
What causes this issue? Period ranges overlap in the following consolidation frequencies: &V1&System Response The system issues an error mes...
G0628
The from-period is greater than the to-period
What causes this issue? In the range of periods that you entered, the from-period (&V1&) is greater then the to-period (&V2&).System ...
G0631
Investment data is missing for activity/investee = &1&2&3
What causes this issue? No investment entries (activity/investee) exist for the following activities, which were triggered by equity entries: &V1...
G0632
Cons unit &1 is not assigned to cons group &2
What causes this issue? The <DS:GLOS.consolidation_unit>consolidation unit</> &V1& is not assigned to <DS:GLOS.consolidation_g...
Click on this link to search all SAP messages.