How To Fix FTI054 - Green limit must be less than yellow limit


FTI054 - Overview

  • Message type: E = Error

  • Message class: FTI - Treasury Information System

  • Message number: 054

  • Message text: Green limit must be less than yellow limit

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FTI054 - Green limit must be less than yellow limit ?
    The SAP error message FTI054, which states "Green limit must be less than yellow limit," typically occurs in the context of configuring thresholds for key performance indicators (KPIs) in SAP systems, particularly in the area of financial or operational reporting.
    
    Cause: This error arises when the configuration for a KPI has been set incorrectly. Specifically, it indicates that the "green limit" (the threshold for acceptable performance) has been set to a value that is equal to or greater than the "yellow limit" (the threshold for warning or caution). In a typical KPI setup: Green Limit: Represents the optimal or acceptable range of performance. Yellow Limit: Represents a warning range, indicating that performance is approaching a critical level. Red Limit: Represents a critical level where performance is unacceptable.
    Solution: To resolve this error, you need to adjust the limits in the KPI configuration. Here are the steps to do so: Access the KPI Configuration: Navigate to the relevant configuration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker