Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix FLOG_SUPPLY_PROCESS044 - Enter a single supply plant for MRP run.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FLOG_SUPPLY_PROCESS -

  • Message number: 044

  • Message text: Enter a single supply plant for MRP run.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FLOG_SUPPLY_PROCESS044 - Enter a single supply plant for MRP run. ?

    The SAP error message FLOG_SUPPLY_PROCESS044 indicates that during an MRP (Material Requirements Planning) run, the system requires a single supply plant to be specified, but it has detected multiple supply plants or none at all. This error typically arises in the context of supply chain management and logistics, particularly when dealing with planning and procurement processes.

    Cause:

    1. Multiple Supply Plants: The MRP run is trying to process materials that are linked to multiple supply plants, and the system requires a single plant to be specified for the run.
    2. No Supply Plant Specified: The MRP run may not have a supply plant defined, leading to ambiguity in the planning process.
    3. Configuration Issues: There may be configuration settings in the MRP or supply chain management module that are not set up correctly, leading to this error.
    4. Master Data Issues: The material master data may not be correctly maintained, particularly in the views related to MRP and supply chain.

    Solution:

    1. Specify a Single Supply Plant: Ensure that when you initiate the MRP run, you specify a single supply plant. This can usually be done in the selection screen of the MRP transaction (e.g., MD01, MD02).
    2. Check Material Master Data: Review the material master data for the materials involved in the MRP run. Ensure that the supply plant is correctly assigned and that the MRP views are properly maintained.
    3. Review MRP Configuration: Check the configuration settings in the MRP module to ensure that they are set up to allow for the correct processing of supply plants.
    4. Use MRP Areas: If applicable, consider using MRP areas to manage planning for specific supply plants or locations more effectively.
    5. Run MRP for Individual Plants: If you need to run MRP for multiple plants, consider running the MRP process separately for each plant instead of trying to process them all at once.

    Related Information:

    • Transaction Codes: Common transaction codes related to MRP include MD01 (MRP Run), MD02 (MRP Run for Single Material), and MD03 (MRP Run for Single Material with MRP Area).
    • MRP Settings: Familiarize yourself with MRP settings in SPRO (SAP Customizing Implementation Guide) under the Logistics section.
    • Documentation: Refer to SAP Help documentation for detailed information on MRP processes and error handling.
    • User Exits and BAdIs: If custom logic is involved, check for any user exits or BAdIs that might be affecting the MRP run.

    By addressing the above points, you should be able to resolve the error and successfully execute the MRP run.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker