How To Fix FLOG_SUPPLY_PROCESS039 - Enter a single demand plant for MRP run.


FLOG_SUPPLY_PROCESS039 - Overview

  • Message type: E = Error

  • Message class: FLOG_SUPPLY_PROCESS -

  • Message number: 039

  • Message text: Enter a single demand plant for MRP run.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FLOG_SUPPLY_PROCESS039 - Enter a single demand plant for MRP run. ?
    The SAP error message FLOG_SUPPLY_PROCESS039 indicates that during an MRP (Material Requirements Planning) run, the system requires a single demand plant to be specified, but it has detected multiple plants or no plant at all. This error typically arises in the context of supply chain management and logistics, particularly when dealing with demand planning and supply planning processes.
    
    Cause: Multiple Demand Plants: The MRP run is being executed for multiple demand plants, which is not allowed in this context. No Demand Plant Specified: The MRP run was initiated without specifying a demand plant.
    Configuration Issues: There may be configuration settings in the MRP or supply chain management module that are not set up correctly. Data Entry Errors: Incorrect or incomplete data entry in the MRP parameters or planning settings.
    Solution: Specify a Single Demand Plant: Ensure that when you initiate the MRP run, you specify only one demand plant. This can usually be done in the selection

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker