Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FDT_CP_MSG301 - Dependent project &1 of project &2 belongs to invalid storage type


FDT_CP_MSG301 - Overview

  • Message type: E = Error

  • Message class: FDT_CP_MSG -

  • Message number: 301

  • Message text: Dependent project &1 of project &2 belongs to invalid storage type

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FDT_CP_MSG301 - Details

  • The SAP error message FDT_CP_MSG301 indicates that there is an issue with the dependency of projects in the context of the SAP Fiori Development Toolkit (FDT). Specifically, it states that a dependent project (project &1) of another project (project &2) belongs to an invalid storage type. This typically occurs when there is a mismatch or misconfiguration in the project settings or storage types.
    
    Cause: Invalid Storage Type: The dependent project is associated with a storage type that is not recognized or is invalid in the current context.
    Configuration Issues: There may be configuration issues in the project settings that lead to the dependency being incorrectly defined. Project Deletion or Inaccessibility: The dependent project may have been deleted or is not accessible due to permission issues or other reasons. Transport Layer Issues: If the projects are part of a transport layer, there may be issues with the transport configuration.
    Solution: Check Storage Types: Verify the storage types assigned

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FDT_CP_MSG301 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker