How To Fix FCOM_PLANNING_CORE028 - Missing authorizations for planning on project &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FCOM_PLANNING_CORE - Messages for Package FCOM_PLANNING_CORE

  • Message number: 028

  • Message text: Missing authorizations for planning on project &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FCOM_PLANNING_CORE028 - Missing authorizations for planning on project &1 ?

    The SAP error message FCOM_PLANNING_CORE028 indicates that a user is attempting to perform a planning operation on a project but lacks the necessary authorizations to do so. This error typically arises in the context of SAP Project System (PS) or SAP Controlling (CO) modules, where specific authorizations are required to access and manipulate planning data.

    Cause:

    The primary cause of this error is that the user does not have the required authorization objects assigned to their user profile. This can happen due to:

    1. Missing Authorization Roles: The user may not have been assigned the appropriate roles that include the necessary authorizations for planning activities.
    2. Authorization Object Restrictions: Even if the user has a role, the specific authorization objects related to project planning may not be included or may have restrictions that prevent access.
    3. Project-Specific Authorizations: The user may not have been granted access to the specific project they are trying to plan for.

    Solution:

    To resolve the error, follow these steps:

    1. Check User Authorizations:

      • Use transaction code SU53 immediately after the error occurs to analyze the missing authorizations. This transaction will show you which authorization checks failed.
      • Alternatively, you can use transaction code SU01 to view the user’s profile and roles.
    2. Review Authorization Roles:

      • Ensure that the user has the necessary roles assigned that include the required authorization objects for planning in the project.
      • Common authorization objects related to project planning include:
        • C_PROJ: Project Management
        • C_PRCM: Project Controlling
        • C_PRCF: Planning Functions
    3. Modify Roles:

      • If the required authorizations are missing, you may need to modify the existing roles or create new roles that include the necessary authorizations.
      • Use transaction code PFCG to manage roles and authorizations.
    4. Assign Project-Specific Authorizations:

      • If the planning is project-specific, ensure that the user has been granted access to the specific project in question. This may involve setting up project-specific authorizations.
    5. Consult with Security Team:

      • If you do not have the necessary permissions to change roles or authorizations, consult with your SAP security team or administrator to assist in resolving the issue.

    Related Information:

    • Documentation: Refer to SAP documentation for detailed information on authorization objects and their usage in project planning.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to authorizations in your version of SAP.
    • Training: Consider training sessions for users on how to manage authorizations and understand the implications of missing authorizations in SAP.

    By following these steps, you should be able to identify and rectify the authorization issues leading to the FCOM_PLANNING_CORE028 error.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author