How To Fix FCC0011 - % was not scheduled. Predecessor was not performed correctly


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FCC0 - Messages in Financial Closing Cockpit

  • Message number: 011

  • Message text: % was not scheduled. Predecessor was not performed correctly

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FCC0011 - % was not scheduled. Predecessor was not performed correctly ?

    The SAP error message FCC0011, which states that "% was not scheduled. Predecessor was not performed correctly," typically occurs in the context of production planning and scheduling within SAP. This error indicates that a particular operation or task could not be scheduled because its predecessor task did not complete successfully or was not performed as expected.

    Causes:

    1. Predecessor Task Failure: The predecessor task may have failed due to various reasons, such as resource unavailability, incorrect settings, or errors in the task execution.
    2. Incorrect Task Dependencies: The dependencies between tasks may not be correctly defined, leading to scheduling issues.
    3. Resource Constraints: Resources required for the predecessor task may not be available, causing it to fail.
    4. Configuration Issues: There may be configuration issues in the production planning settings that prevent proper scheduling.
    5. Data Inconsistencies: Inconsistent or incorrect data in the master data (like BOM, routing, etc.) can lead to scheduling problems.

    Solutions:

    1. Check Predecessor Task Status: Verify the status of the predecessor task to ensure it has been completed successfully. If it has failed, investigate the reasons for the failure and resolve them.
    2. Review Task Dependencies: Ensure that the dependencies between tasks are correctly defined in the system. Adjust them if necessary.
    3. Resource Availability: Check the availability of resources required for the predecessor task. If resources are not available, either reschedule the task or allocate the necessary resources.
    4. Configuration Review: Review the configuration settings in the production planning module to ensure they are set up correctly.
    5. Data Validation: Validate the master data (BOM, routing, etc.) to ensure there are no inconsistencies or errors that could affect scheduling.
    6. Re-run Scheduling: After addressing the issues, re-run the scheduling process to see if the error persists.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or MD04 (Stock/Requirements List) to check the status of production orders and their dependencies.
    • Logs and Messages: Check the logs and messages in the system for more detailed information about the failure of the predecessor task.
    • SAP Notes: Look for relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for production planning and scheduling for more insights into task dependencies and scheduling processes.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages: