How To Fix F7251 - Do not specify run date/time and test run switch at the same time


F7251 - Overview

  • Message type: E = Error

  • Message class: F7 - Program Error Messages

  • Message number: 251

  • Message text: Do not specify run date/time and test run switch at the same time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message F7251 - Do not specify run date/time and test run switch at the same time ?
    The SAP error message F7251, which states "Do not specify run date/time and test run switch at the same time," typically occurs when you are trying to execute a financial transaction or report that requires a specific run date/time while also indicating that it should be a test run. This situation creates a conflict because the system cannot perform a test run with a specified execution date and time.
    
    Cause: The error arises when both the following conditions are met in the execution parameters: A specific run date and time are provided. The test run switch (often a checkbox or parameter) is activated.
    Solution: To resolve this error, you need to adjust your execution parameters. Here are the steps you can take: Remove the Run Date/Time: If you want to perform a test run, do not specify a run date and time. Simply leave these fields blank. Disable the Test Run: If you need to specify a run

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author